You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS

    SBC: Micro Analysis & Design Inc            Topic: N/A

    N/A

    SBIR Phase I 1991 Nuclear Regulatory Commission
  2. SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1993 Nuclear Regulatory Commission
  3. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    THERE HAS RECENTLY BEEN HEIGHTENED CONCERN FOR THE POSSIBILITY THAT NUCLEAR POWER-PLANT ACCIDENTS DURING SHUTDOWNS COULD BE IMPORTANT CONTRIBUTORS TO THE OVERALL RISK PROFILE OF THESE PLANTS. THE 1986 SOVIET ACCIDENT AT CHERNOBYL WAS THE PRINCIPAL EVENT THAT LED TO THIS HEIGHTENED CONCERN, BUT A FEW RECENT EVENTS AT U.S. PLANTS HAVE ALSO CONTRIBUTED. TODAY, IT IS WIDELY UNDERSTOOD THAT THE RISK OF ...

    SBIR Phase II 1992 Nuclear Regulatory Commission
  4. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. REAL-TIME COLLECTION OF OPERATIONAL DATA TO SUPPORT RISK-BASED OPERATION REGULATION AND INSPECTIONS AT NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    COMPUTERIZED DATA COLLECTION DEVICES EXIST AND ARE BEING USED IN VARIOUS APPLICATIONS AT SOME NPPS FOR SYSTEMS AND EQUIPMENT NOT INSTRUMENTED IN THE CONTROL ROOM. HOWEVER, CURRENT APPLICATIONS IN THE NUCLEAR POWER INDUSTRY ARE RATHER SPORADIC AND NOT EXPLOITING THE FULL POTENTIAL OF THE TECHNOLOGY. FOR EXAMPLE, SEVERAL DIFFERENT NPPS USE SUCH SYSTEMS FOR SINGLE- PURPOSES SUCH AS TRENDS IN EQUIPMEN ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  6. QUANTIFICATION OF CONSERVATISMS IN SEISMIC RISK ESTIMATES THROUGH ENGINEERING ADVANCEMENT OF SEISMIC PRA

    SBC: Risk Engineering Inc.            Topic: N/A

    SIGNIFICANT CONSERVATISM IN MODERN SEISMIC PRA DERIVES FROM SIMPLIFICATIONS IN GROUND-MOTION CHARACTERIZATION AT THE INTERFACE OF SEISMIC HAZARD AND FRAGILITY METHODOLOGIES. THIS CONSERVATISM ARISES BECAUSE A SINGLE COMPOSITE-MAGNITUDE, BROAD-BAND, GROUND-MOTION SPECTRUM IS USED TO DERIVE FRAGILITY FUNCTIONS, WHEREAS THE MAJORITY OF MOTIONS CONTRIBUTING TO SITE HAZARD HAVE (LESS-DAMAGING) NARROW-B ...

    SBIR Phase II 1991 Nuclear Regulatory Commission
  7. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  8. HIGH SENSITIVITY LANDFILL MONITOR

    SBC: Shonka Research Associates            Topic: N/A

    THE PROPOSED RESEARCH WILL PROVIDE PROOF OF PRINCIPLE OF NEWRADIATION DETECTION TECHNOLOGY THAT WHEN FULLY DEVELOPED WILL PREVENT INADVERTENT DISPOSAL OF RADIOACTIVE MATERIAL INLANDFILLS AND SEWAGES. THE TECHNOLOGY WILL PROVIDE ORDER OFMAGNITUDE IMPROVEMENT IN DETECTION OVER CONVENTIONAL SYSTEMS. THE TECHNOLOGY WILL PROVIDE FIELD RUGGED AND COST COMPETITIVE DEVICES. THE PROPOSED RESEARCH WILL PROV ...

    SBIR Phase II 1992 Nuclear Regulatory Commission
  9. HIGH SENSITIVITY LANDFILL MONITOR

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1991 Nuclear Regulatory Commission
  10. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government