You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. HCAN Sensor Manager

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: MDA04023

    The goal of a sensor manager is to cue the right sensor to perform the right service on the right target at the right time. This task essentially implies JDL Level 4 strategies and algorithms for control and action. In response to SBIR MDA04-023, 21st Century Systems, Inc. is pleased to propose researching and developing state-of-the-art "system-of-systems" management for sensor platforms with mul ...

    SBIR Phase I 2004 Department of DefenseMissile Defense Agency
  2. Ion-Implanted 2-D MESFET Technology for Wireless Communications

    SBC: Advanced Device Technologies,            Topic: N/A

    This Phase I project has two primary objectives. The first objective is to evaluate the feasibility of a fully ion implanted fabrication process based on the heterodimensional 2-D MESFET. The new device, the 2-D JFET, will have p+ ion implanted sidegates which laterally modulate a thin, highly doped n-type conducting channel. The 2-D JFET should have excellent high speed, low power characteristics ...

    SBIR Phase I 1997 Department of DefenseMissile Defense Agency
  3. Parallel Design Tools for Optimization of Smart Structures

    SBC: ADVANCED MECHANICS TECHNOLOGY, LTD.            Topic: BMDO99012

    This SBIR Phase II project is to continuously and fully develop the title parallel computational design tools initiated in Phase I into superpowerful, commercializable prototype design tools (computer codes) in the following manner: (i) adopting/extending our own superefficient Integral Global/Local Optimization (IGLO) algorithms, (ii) extending/developing some efficient constraint treatment sche ...

    SBIR Phase II 2004 Department of DefenseMissile Defense Agency
  4. Integrated Insulation Processing and Testing System

    SBC: Applied Physical Electronics, L.C.            Topic: MDA04039

    The Achilles heel in high voltage systems is with dielectric materials used for insulation. Liquid dielectrics offer advantages in self-healing and thermal management properties, but their dielectric strength is low. Liquid dielectrics also require ancillary devices for flowing and de-ionizing, and these systems are vulnerable to leaks in high-g environments. Solid dielectrics offer advantages ...

    SBIR Phase I 2004 Department of DefenseMissile Defense Agency
  5. Integrated Data Compression and Security Algorithms

    SBC: Asier Technology Corporation            Topic: MDA02040

    In Phase I of this SBIR, Asier conducted research to determine if telemetry data could be compressed and encrypted. Asier determined that two different types of MDA telemetry data could be compressed and encrypted in real-time (no added latency) and without damaging either the integrity or synchronicity of the data stream. Telemetry files from the payload launch vehicle (PLV) and orbital/sub-orb ...

    SBIR Phase II 2004 Department of DefenseMissile Defense Agency
  6. Lightweight Adaptive Propeller for HALE Applications

    SBC: AURORA FLIGHT SCIENCES CORPORATION            Topic: MDA04004

    Significant improvements in propulsion systems are necessary in order to support high altitude, long endurance (HALE) missions for airships and UAV's. One of the critical components of the propulsion system is the propeller. The proposed research will demonstrate the feasibility of producing large diameter light weight adaptive propellers from launch through long duration station keeping in a va ...

    SBIR Phase I 2004 Department of DefenseMissile Defense Agency
  7. OPTIMAL ENERGY MANAGEMENT FOR KINETIC ENERGY WEAPONS

    SBC: BARRON ASSOCIATES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  8. Nitride, Carbide and Non-Oxide In Situ Coatings Using RECVD,A New CVD Method

    SBC: CCVD, Inc dba MicroCoating Technologies (MCT)            Topic: N/A

    Currently, thermal spray (flame and plasma spray) is the only single step method of applying most metal and non-oxide ceramic coatings to large objects. These coatings are usually of a low quality, and thin films cannot be applied. An in situ deposition technique that inexpensively and easily applies nitrides, carbides and other non-oxide thin or thick films in an environmentally friendly manner i ...

    SBIR Phase I 1997 Department of DefenseMissile Defense Agency
  9. Production Friendly GaN Coatings Using RECVD, a New CVD Method

    SBC: CCVD, Inc dba MicroCoating Technologies (MCT)            Topic: N/A

    Currently vacuum based methods of PVD and CVD are the only processes for forming GaN thin films and coatings. These methods are usually expensive and are not applied in a production friendly manner. An atmospheric deposition technique that inexpensively and easily applies GaN thin or thick films in an environmentally friendly manner is a priority for any number of DOD and commercial applications. ...

    SBIR Phase I 1997 Department of DefenseMissile Defense Agency
  10. Realtime Body Dynamic Antenna Modeled GPS/JAMMER Simulator for HWIL

    SBC: CENTER FOR REMOTE SENSING, INC.            Topic: MDA04028

    Hardware in the loop simulations provide important performance and systems integration information without the inherent risks and costs of flight testing. These simulations require real-time high fidelity signal generation with flexible parameters and close modeling of the true signals. This proposal details software controlled GPS signal simulation system compatible with current and future GPS si ...

    SBIR Phase I 2004 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government