You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    41299 November 19, 1996 FM Technologies, Inc. In the Relativistic Klystron Two-Beam Accelerator, which is currently under development, power from a low-energy, high-current, bunched beam is converted to micro-waves via the klystron mechanism and used to provide power for a high-energy linac, specifically a future Next Linear Collider upgrade to l.0 TeV. ...

    SBIR Phase II 1997 Department of Energy
  2. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  3. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  4. A DIODE LASER FREQUENCY STANDARD USING VELOCITY MODULATION

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    THIS PROJECT WILL DEVELOP A FREQUENCY STANDARD FOR THE URANIUM-STOMIC VAPOR LASER ISOTOPE SEPARATION (U-AVLIS) PROCESS USING A VISIBLE DIODE LASER LOCKED TO AN ATOMIC RESONANCE. A KEY FEATURE IS THE USE OF THE VELOCITY MODULATION METHOD TO PROVIDE A HIGH SIGNAL/NOISE LOCKING DISCRIMINANT WITHOUT THE NEED TO MODULATE THE LASER, AND WITH THE HIGH POWERS FOR SUB-DOPPLER EFFECTS. PHASE I WILL PRODUCE ...

    SBIR Phase I 1993 Department of Energy
  5. ADVANCED ULTRASONIC METHODS FOR THE NONDESTRUCTIVE EVALUATION OF BOND QUALITY IN BRAZED COMPOSITE-METAL JOINTS

    SBC: KARTA TECHNOLOGIES            Topic: N/A

    A NONDESTRUCTIVE ULTRASONIC METHOD CAPABLE OF QUANTITATIVELY EVALUATING THE BOND STRENGTH AND RESIDUAL INTERFACE STRESSES AT BRAZED JOINTS, SUCH AS CARBON/CARBON-COPPER USED IN FUSION REACTOR FIRST WALL STRUCTURES, IS PLANNED. THE MECHANICAL PROPERTIES AT THE INTERFACE CONTROL THE INTIMACY OF CONTACT. BY EXAMINING THE BOUNDARY CONDITIONS THE BONDLINE PROPERTIES MAY POTENTIALLY BE EVALUATED. TWO IN ...

    SBIR Phase II 1994 Department of Energy
  6. ADVANCED ULTRASONIC METHODS FOR THE NONDESTRUCTIVE EVALUATION OF BOND QUALITY IN BRAZED COMPOSITE-METAL JOINTS

    SBC: KARTA TECHNOLOGIES            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of Energy
  7. Advanced Water Sensor for Unmanned Aerial Vehicles

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    40444 November 18, 1996 Southwest Sciences, Inc. Increasing energy consumption and environmental degradation may contribute to deleterious changes in the radiative balance and chemical composition of the atmosphere. The quantitative measurement of water vapor in the troposphere and lower stratosphere is crucial for the study of meteorological and climati ...

    SBIR Phase II 1997 Department of Energy
  8. Advanced Water Sensor for Unmanned Aerial Vehicles

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  9. A FEASIBILITY STUDY FOR A 5-MW, 300-GHZ QUASI-OPTICAL GYROTRON

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Energy
  10. A FEASIBILITY STUDY FOR A SEISMIC EARLY WARNING SYSTEM FOR NUCLEAR POWER PLANT SHUTDOWN

    SBC: ENSCO Inc            Topic: N/A

    A FEASIBILITY STUDY WILL BE CONDUCTED OF A SEISMIC SCRAM-PROCESSING SYSTEM IN WHICH P WAVES FROM LARGE EARTHQUAKES ARE DETECTED AND ANALYZED IN TIME TO INITIATE A NUCLEAR POWER PLANT CORE SHUTDOWN BEFORE THE ARRIVAL OF LARGE, DAMAGING SHEAR WAVE PHASES. A PROTOTYPE SEISMIC SCRAM-MONITORING SYSTEM WILL BE DESIGNED AND IMPLEMENTED ON A SUN 3/160 ENGINEERING WORKSTATION. IN THE PROPOSED SYSTEM, SEISM ...

    SBIR Phase I 1987 Department of Energy
US Flag An Official Website of the United States Government