You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  2. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  3. COMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS.

    SBC: Jfb Associates Inc.            Topic: N/A

    COMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS. A MAJOR PROBLEM ASSOCIATED WITH PERFORMING A CFFA IS THE ABSENCE OF SUPPORTING QUALITATIVE OR QUANTITATIVE COMPONENT FAILURE DATA. EXTENSIVE AMOUNTS OF CO ...

    SBIR Phase I 1983 Nuclear Regulatory Commission
  4. DEGRATION OF NUCLEAR PLANT TEMPERATURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    SAFETY SYSTEM TEMPERATURE SENSORS IN NUCLEAR POWER PLANTS ARE SUBJECT TO PERFORMANCE DEGRATION BECAISE PF AGING EFFECTS. A PROGRAM OF LABORATORY TESTING AND IN-SITU TESTINGIS NEEDED TO ENSURE THAT AGING DOES NOT LEAD TO REDUCED SAFETY AND AVAILABILITY. MUCH OF THE TECHNOLOGY NEEDED FOR THIS PROGRAM NOW EXISTS AS ISOLATED METHODS AND PROCEDURES. THESE WILL BE USED IN THIS PROJECT TO PERFORM AN AGIN ...

    SBIR Phase II 1987 Nuclear Regulatory Commission
  5. Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement

    SBC: DPD, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  6. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    TWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.

    SBIR Phase II 1990 Nuclear Regulatory Commission
  7. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  8. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  10. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government