You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING
SBC: Atkinson-noland Assoc. Inc. Topic: N/ARESIDUAL LIFETIME EVALUATION OF EXISTING NUCLEAR FACILITIES REQUIRES DETAILED INFORMATION REGARDING CONDITION OF CONTAINMENT AND SUPPORT STRUCTURES. CURRENT NONDESTRUCTIVE METHODS FOR SUBSURFACE EVALUATION OF REINFORCED CONCRETE USE COMPLEX EQUIPMENT AND RELY HEAVILY ON INTERPRETATION BY THE OPERATOR. A RESEARCH EFFORT IS PROPOSED TO EXAMINE THE USE OF COMPUTERIZED TOMOGRAPHIC IMAGING FOR LOCATING ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.
SBC: Corpe Corp. Topic: N/AAT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement
SBC: DPD, Inc. Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission -
A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.
SBC: Eda Consultants Topic: N/ATHE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM
SBC: EPOCH ENGINEERING, INC. Topic: N/AWHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA
SBC: Frh, Inc. Topic: N/ACHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS
SBC: Micro Analysis & Design Inc Topic: N/ATHE PURPOSE OF THIS EFFORT IS TO STUDY THE FEASIBILITY OF AND, HOPEFULLY, VALIDATE THE USE OF TASK NETWORK MODELING TOSTUDY HUMAN FACTORS IN THE CONTROL ROOM. TASK NETWORK MODELING EXTENDS A HUMAN ENGINEERING TASK ANALYSIS INTO A COMPUTER MODEL. WE PROPOSE THAT PERTURBING THE INDIVIDUAL TASKS IN A TASK NETWORK MODEL IN A MANNER PREDICTED FROM CONTROL ROOM DESIGN CHANGES, TASK AUTOMATION, OR THE CO ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
INTERGRATING FIBER OPTIC RADIATION DOSIMETER
SBC: Quantix Corp Topic: N/ATHE PROPOSED PROJECT WILL DEMONSTRATE THE FEASIBILITY OF EMPLOYING ELECTRON TRAPPING (ET) MATERIALS WITH FIBER OPTICS FILAMENTS FOR USE AS MICROPROBE RADIATION DOSIMETERS.THE ET MATERIALS TM CAN BE INTERROGATED BY NEAR-INFRARED TO PRODUCE VISIBLE OUTPUT SCALABLE TO RADIATION DOSES AT THE FIBER TIP. PHASE I WILL ASSESS THE PERFORMANCE OF SUCH MATERIALS AS MICROPORBE RADIATION DETECTORS INTEGRATED W ...
SBIR Phase II 1987 Nuclear Regulatory Commission -
DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION
SBC: Shonka Research Associates Topic: N/ATWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.
SBIR Phase II 1990 Nuclear Regulatory Commission