You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Abrasion protection, ballistic tolerance, and laser protection for windows/sensor on rotary wing aircraft.

    SBC: INTER MATERIALS, LLC            Topic: SOCOM07007

    Some of the United States Special Operations Command (USSOCOM) greatest concerns are to maintain the pilot’s ability to see clearly and to provide to the aircraft occupants a greater degree of UV rays, laser and ballistic protection than being currently afforded. However, the weight penalty suffered by the installation of current transparent armor systems would require significant loss of payloa ...

    SBIR Phase I 2007 Department of DefenseSpecial Operations Command
  2. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  3. Conformal Appliqué Antennas for Unmanned Aerial Vehicles and Aircraft

    SBC: WANG ELECTRO-OPTO CORPORATION            Topic: SOCOM06002

    This SBIR phase-II proposal is to develop conformal appliqué antennas mounted on Unmanned Aerial Vehicles (UAV) and aircraft for FM/TV broadcast in PSYOPS (psychological-operations). The technical problem is very challenging, especially for that on UAVs, because of the constraints on antenna size and form factor by the platform, and since the gain-bandwidth of an antenna is fundamentally limited ...

    SBIR Phase II 2007 Department of DefenseSpecial Operations Command
  4. Cultural Intelligence Wiki-berry

    SBC: TRIDENT SYSTEMS LLC            Topic: SOCOM07006

    The GWOT requires Special Operations Forces to operate in a variety of environments and rely heavily on the support of local forces while operating in a wide variety of countries. In order to consistently leverage this support as well as understand the underlying motivations and influences of both friends and foes, warfighters need to understand the particular aspects of the culture where they ar ...

    SBIR Phase I 2007 Department of DefenseSpecial Operations Command
  5. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    TWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.

    SBIR Phase II 1990 Nuclear Regulatory Commission
  6. 3-D Facial Imaging System

    SBC: DIGITAL SIGNAL CORP.            Topic: SOCOM07004

    Digital Signal Corporation (DSC) will adapt its current operational Bio-LIDAR 3D face imaging system to SOCOM’s application set and 100 Meter range requirements. The Bio-LIDAR is a highly evolved extension of an industrial metrology lidar that produces eye-safe precision 3D measurements at 60 meters. The Bio-LIDAR can monitor heartbeat, breathing and audio biological signals. During Phase I DSC ...

    SBIR Phase I 2007 Department of DefenseSpecial Operations Command
  7. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  8. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. Non-Invasive Battery State-of-Charge Sensor

    SBC: Power Sciences, Inc.            Topic: N/A

    The operational readiness of critical equipment often depends on the integrity of the battery subsystem. A small magnitude magnetic field, generated by a coil, can be used to monitor the state-of-charge and possibley long-term state-of-health of batteries. The proposed work will determine the feasibility of using a non-invasive sensor-external to a battery - and not connected to it's terminals. ...

    SBIR Phase I 1996 Department of DefenseSpecial Operations Command
  10. TWO NEW NDE TECHNIQUES FOR INSPECTION OF CONTAINMENT WELDS BENEATH COATINGS

    SBC: PHYSICAL RESEARCH, INC.            Topic: N/A

    INSPECTION OF PAINTED OR COATED CARBON STEEL SURFACES OFTEN INVOLVES THE REMOVAL OF THE COATING PRIOR TO INSPECTION, ESPECIALLY WHEN THE USE OF MAGNETIC PARTICLE TESTING (MT) IS REQUIRED. IN THE CASE OF EXAMINATION OF CONTAINMENT VESSEL WALLS IN NUCLEAR POWER PLANTS, THE REMOVAL IS TIME CONSUMING, RESULTING IN INCREASED RADIATION EXPOSURE TO WORKERS. IN ADDITION, THE REMOVAL MUST BE DONE WITHOUT C ...

    SBIR Phase II 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government