You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Team Transportable Communications/Collection Suite

    SBC: INFORMATION TECHNOLOGY & APPLICATIONS CO            Topic: SOCOM03010

    The objective of this research project is to continue the Team Transportable Collection/Communications architecture work started under SBIR Phase I, investigating the latest in communication and collection technologies, and developing a plug and play, scaleable architecture to satisfy SOF portable command center needs. At the completion, ITAC will deliver one TTS prototype, demonstrating seamless ...

    SBIR Phase II 2005 Department of DefenseSpecial Operations Command
  2. Miniature Multi-band Radar Beacon (MMRB)

    SBC: SIERRA MONOLITHICS, INC.            Topic: SOCOM04003

    The dual band beacon SMP2000 has been successfully deployed in various missions providing combat identification, multiple drop/landing/assault marking, and as point designators for targeting. However, the SMP2000 does not satisfy the future requirement for Combat ID and Blue Force tracking due to size, weight, GPS capability, Joint-STARS compatibility, and radar reflective .aircraft for Blue Forc ...

    SBIR Phase II 2005 Department of DefenseSpecial Operations Command
  3. Directed Energy Tactical Mission Analysis Code

    SBC: APPLIED SCIENCES LABORATORY, INC.            Topic: SOCOM03007

    The Directed Energy Tactical Mission Application Code (DETMAC) is a mission planning simulation tool to model directed-energy weapon capabilities, target vulnerabilities, and environmental constraints. It will be used by mission planners to visualize an entire mission timeline and prompt development of optimal tactics, techniques and procedures for successful employment of new weapon capabilities ...

    SBIR Phase II 2005 Department of DefenseSpecial Operations Command
  4. Versatile, Expandable, Strategic, and Tactical Equipment Carrier

    SBC: Physical Optics Corporation            Topic: SOCOM03011

    In response to the SOCOM MANPACK Innovative Vest Research solicitation topic, Physical Optics Corporation (POC) proposes to develop novel Versatile, Expandable, Strategic and Tactical Equipment Carrier (VESTEC) technology to be integrated into the MOLLE/SPEARS/BALCS and ELCS military vests. Phase II will address both short-term and long-term SOCOM needs, delivering multiple sets of prototypes. F ...

    SBIR Phase II 2005 Department of DefenseSpecial Operations Command
  5. Alternative Power Sources

    SBC: FRONT EDGE TECHNOLOGY, INC.            Topic: SOCOM04008

    This program will develop a lightweight highly-reliable regenerative power source for installation by SOF at remote sensor sites. Front Edge Technology’s (FET’s) approach is to integrate ultra-high-reliability solar cells and FET’s new long-life solid-state energy-storage-devices into a robust lightweight “Power Module”. The module components will be highly robust and able to withstand ...

    SBIR Phase II 2005 Department of DefenseSpecial Operations Command
  6. Infared Signature Suppression

    SBC: Sparta, Inc.            Topic: N/A

    Suppression of the Infra-red (IR) signature of Special Operations Command (SOCOM) aircraft is a prerequisite for increasing survivability of the aircraft in the threat environment in which these aircraft must function. the primary goal of this program is to minimize the IR signature associated with the engine exhaust of the SOCOM C-130 and to demonstrate the potential of usage ofthe same technolo ...

    SBIR Phase II 1996 Department of DefenseSpecial Operations Command
  7. Very Shallow Water Mine Countermeasures Diver Sonar-Lidar Sensor

    SBC: Hendrickson & Associates            Topic: N/A

    Currently an effective diver mine imaging sensor for use in VSW mine reconnaissance does not exist. The SBIR topic requests a capability to locate and image mine targets within a 45 deg wide x 10 deg high field-of-view and to image targets with a resolution of at least 3" at a range of 20 yards. An acoustic lens sonar is a preferred technical approach. Both an acoustic lens sonar and a more compac ...

    SBIR Phase II 1996 Department of DefenseSpecial Operations Command
  8. Small Virtual Receiving Antenna

    SBC: Walter Gee & Associates, LLC            Topic: N/A

    Modern manpack or hand held RF communication systems mandate an ultra compact and lightweight transceiver design complemented with a physically small antenna system with extraordinary RF bandwidth, high gain capability and omnidirectional radiation patterns. Also, it is desirable to be able to electronically tune the antenna to a specific operating frequency or band. Furthermore, special communica ...

    SBIR Phase II 1996 Department of DefenseSpecial Operations Command
  9. Miniature RF Receiving Antennas

    SBC: Delfin Systems            Topic: N/A

    The Phase I technical objective is to design a series of small receiving antennas which operate in the HF, VHF, and UHF frequency ranges (approximately 1 MHz to 1500 MHz) and then to build and test prototypes of the designs. The antennas are physically small in size and man-packable. Conventional antenna design approaches have constraints which can result in physically large structures, especially ...

    SBIR Phase II 1996 Department of DefenseSpecial Operations Command
  10. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government