You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
CONTINUOUS SPECTROGRAPHIC ANALYSIS OF VANADOUS AND VANADIC IONS
SBC: Omni Tech International Ltd Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER
SBC: Shonka Research Associates Topic: N/ATHE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
DEVELOPMENT OF A CONTAMINATION MONITOR USING VISUAL IDENTIFICATION
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
DEVELOPMENT OF TOOLS FOR SAFETY ANALYSIS OF CONTROL SOFTWARE IN ADVANCED REACTORS
SBC: Advanced Systems Concepts Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH
SBC: Accident Prevention Group Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
AN ADAPTING FINITE ELEMENT MODEL FOR UNSATURATED POROUS MEDIA
SBC: Advanced Projects Research, Incorporated Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1990 Nuclear Regulatory Commission -
MEASUREMENT OF RESIDUAL RADIOACTIVE CONTAMINATION BY 2-D LASER HEATED TLD
SBC: International Sensor Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission