You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    IN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...

    SBIR Phase I 1990 Department of DefenseArmy
  2. ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    IN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...

    SBIR Phase I 1991 Department of DefenseArmy
  3. A Coupled Navier-Stokes/Full Potential Methodology for the Aerodynamic Study of Unsteady Airfoil Geometries in Unsteady Flow

    SBC: CFD RESEARCH CORPORATION            Topic: N/A

    This Small Business Innovation Research Phase I project proposes a coupled Navier Stokes/Full Potential (NS/FPE) solution methodology for the study of unsteady flow analyses of next-generation helicopter airfoils. The principle behind NS/FPE approach is to divide the physical space being solved into an inner viscous zone near the body surface, and an outer wake zone away from the surface. The Na ...

    SBIR Phase I 1997 Department of DefenseArmy
  4. Acoustic Sensor Simulation and Environment Technology

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    A quality simulation which allows a user to simulate the acoustic emissions in a multi-source environment and then study the effects these conditions have on a set of acoustic sensors would be of great value. As acoustic sensors technology continues to advance with robust algorithms for detection, tracking and identification as well as high performance hardware providing real-time operation, thes ...

    SBIR Phase I 1996 Department of DefenseArmy
  5. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  6. A Dialectic Approach to Intelligence Data Fusion For Threat Identification

    SBC: BEVILACQUA RESEARCH CORPORATION            Topic: N/A

    The overall objective of this program will be to demonstrate the feasibility of a Dialectic Neural Network (DNN) architecture for use as an intelligent information processing engine for threat identification. To achieve this goal, several technical objectives have been identified that define, integrate and demonstrate the DNN architecture within the Army's Phoenix C41 software which will be used ...

    SBIR Phase II 1997 Department of DefenseArmy
  7. A Dialectic Approach to Intelligence Data Fusion For Threat Identification

    SBC: BEVILACQUA RESEARCH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseArmy
  8. A Distributed Architecture for Parallel CFD Visualization

    SBC: CFD RESEARCH CORPORATION            Topic: N/A

    Large-scale scientific and engineering simulations currently being performed on high-end parallel computers have exceeded the capabilities of present visualization systems. The proposed system utilizes distributed object technologies (OMG CORBA) to perform parallel, distributed visualization of large computational problems, like computational fluid dynamics and structural dynamics. Distributed a ...

    SBIR Phase I 1997 Department of DefenseArmy
  9. Advanced Armor Vehicle Design

    SBC: Physics Mathematics &            Topic: N/A

    This project applies a combination of Artificial Neural Networks (ANN), Genetic Algorithms (GA), and CAD software to the problem of optimum armor design. Previous work for TACOM has established the efficacy of ANN/GA as applied to the problem of 1-D armor design. This new work will extend the concept to full 3-D vehicle geometries (CAD models). The CAD part of the code will handle the 3D data d ...

    SBIR Phase I 1997 Department of DefenseArmy
  10. ADVANCED CONCEPT EVALUATION

    SBC: Physics Mathematics &            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
US Flag An Official Website of the United States Government