You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Title missing
SBC: SCIENCE & ENGINEERING ASSOC., INC. Topic: N/AN/A
SBIR Phase II 1996 Department of DefenseAir Force -
REDTAIL Variant UAV DEMONSTRATION
SBC: AZURE SUMMIT TECHNOLOGY, INC. Topic: AF083053The purpose of this Phase II SBIR is to research, develop, and integrate SIGINT/Geolocation capabilities into the GD/ICE REDTAIL Platform, and perform flight testing in a relevant environment against relevant threat radios. The Azure team will demonstrate this capability in a remote-controlled network environment leveraging the SRW tactical data link to demonstrate threat situation awareness on th ...
SBIR Phase II 2011 Department of DefenseAir Force -
REDTAIL Variant SIGINT
SBC: AZURE SUMMIT TECHNOLOGY, INC. Topic: AF093134The purpose of this Phase II SBIR is to research, develop, and integrate SIGINT capabilities into the GD/ICE REDTAIL Platform, and perform lab testing in a relevant environment against relevant threat radios. The Azure team will demonstrate this capability in a remote-controlled network environment leveraging the SRW tactical data link to demonstrate threat situation awareness on the computer of t ...
SBIR Phase II 2011 Department of DefenseAir Force -
Adaptive Control of Digital Channelized Receivers
SBC: AZURE SUMMIT TECHNOLOGY, INC. Topic: AF093134Azure Summit proposes to implement a channelized transceiver capable of adapting to operate with multiple signals at arbitrary center frequencies and bandwidths. Our proposed implementation will support wideband (1 GHz) operation in real time using hardware with modest SWAP requirements. BENEFIT: Azure's adaptive channelizer technology offers benefits for a number of applications in electr ...
SBIR Phase II 2011 Department of DefenseAir Force -
V-Band Solid State Power Amplifier
SBC: Nuvotronics, LLC Topic: AF093148Nuvotronics has created a unique metal micromachining process, PolyStrataTM, used to create suspended recta-coax lines, high performance MMIC sockets, and millimeter-wave (MMW) interconnection circuits with low loss, small size/high density, and durability. Nuvotronics and their collaborators are proposing to develop high power, high efficiency V-band Solid State Amplifiers for future Military Sat ...
SBIR Phase II 2011 Department of DefenseAir Force -
Optimized Silent SUAS Propeller Design
SBC: AURORA FLIGHT SCIENCES CORPORATION Topic: AF093163ABSTRACT: Aurora Flight Sciences Corporation (Aurora) asserts that small unmanned aerial system (SUAS) propellers can be made significantly harder to detect with improved aerodynamic performance using proven aerodynamic and acoustic propeller design codes. Aurora will improve the fidelity of the aero-acoustic propeller design optimization code developed in Phase I by implementing metamodels in t ...
SBIR Phase II 2011 Department of DefenseAir Force -
Titel missing
SBC: SVS R&D SYSTEMS, INC. Topic: N/AN/A
SBIR Phase II 1996 Department of DefenseAir Force -
Experimental and Analytical Evaluation of Solid Fueled Gas Generator Effluents Suitable for High Mach Combined Cycle PDE Applications
SBC: Adroit Systems, Inc. Topic: N/AThe topic presented in this proposal has direct application to the development and demonstration of high Mach combined cycle engines. The proposed effort would allow the coupling of a pulse detonation engine (PDE) with a realistic solid fueled gas generator. The specific key technical problems identified in this proposal are the absence of experimental gas generator effluent detonability informat ...
SBIR Phase II 1997 Department of DefenseAir Force -
Fractal Object Database System for Simulation Environments
SBC: Iterated Systems, Inc. Topic: N/AThe objective of this project is to design a fractual object based image database system which enables video insertion into real time simulation systems. A cost/benefit analysis of the design will be performed to determine the utility of implementing the design in Phase II. Requirements for the Fractal Object Database System will be determined in consultation with the Sponsor and from interactio ...
SBIR Phase II 1997 Department of DefenseAir Force -
Cure-On-Demand Conductive Sealant for Rapid OML Repair
SBC: LUNA INNOVATIONS INCORPORATED Topic: AF093112ABSTRACT: The use of sealants in aircraft assembly and outer mold line (OML) repair is widespread. Sealants are used to wet-install fasteners, for sealing overlapping (faying) surfaces, for butt joints between panels, and for seam (fillet) sealing. Aerospace sealants are typically two-component polysulfide or polythioether compositions that can cure by oxidation or by crosslinking with epoxides ...
SBIR Phase II 2011 Department of DefenseAir Force