You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Diode Laser Multigas Analyzer for Advanced Detection of Fires

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    Southwest Sciences will develop a novel fire detection technology based on optical spectroscopy, using diode lasers and fiber optics. Rapid, quantitative detection of part per million concentrations (or better) of multiple gases, including carbon monoxide, carbon dioxide, hydrogen cyanide, hydrogen chloride, and a fiber optical distribution network permits one laser to be used for at least 800 di ...

    SBIR Phase II 1997 Department of Commerce
  2. COMBINED OBJECT-ORIENTED AND NEURAL NETWORK APPROACHES FOR SPATIAL DATA MODELS

    SBC: Quba Inc.            Topic: N/A

    RECENT DEVELOPMENTS EMPLOYING OBJECT-ORIENTED DATA MODELS HAVE DEMONSTRATED THE FEASIBILITY OF REPRESENTING COMPLEX AND ABSTRACT CARTOGRAPHIC FEATURES AS COMPOSITES OF SIMPLER FEATURES. SEPARATE DEVELOPMENTS IN NEURAL-NETWORK TECHNOLOGY HAVE SHOWN PROMISE IN RECOGNIZING OR EXTRACTING SPATIAL FEATURES WITHIN SAMPLE DATA SETS. COMBINING OBJECT-ORIENTED AND NEURAL-NETWORKS APPROACHES MAY LEAD TO NEW ...

    SBIR Phase II 1994 Department of Commerce
  3. A Virtual Machining and Inspection System (VMIS)

    SBC: Icamp, Inc.            Topic: N/A

    The purpose of the VMIS is to allow manufacturers the luxury of testing and perfecting manufacturing plans long before a single machine tool is turned on and resources are committed. The VMIS will allow the user to select an available machine tool and an available inspection device, specify a proposed inspection plan and a dimensional analysis procedure, and then build and inspect hundreds (or ev ...

    SBIR Phase II 1996 Department of Commerce
  4. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  5. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    THE RESEARCH PROGRAM WILL DEVELOP A MICROCOMPUTER BASED SYSTEM OF HARDWARE AND SOFTWARE WHICH WILL ALLOW THE USER TOEXECUTE MAINFRAME BASED CODES ON THE MICROCOMPUTER. IN ADDITION PARALLEL EXECUTION OF SEVERAL CODES AT ONCE IS POSSIBLEA SPECIAL INPUT AND OUTPUT PROCESSOR MODULES WILL ALSO BE DEVELOPED TO DEMONSTRATE THE USER FRIENDLY CAPABILITIES OF THE SYSTEM AND FACILITATE INPUT PREPARATION AND ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  6. SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    IMPLEMENTATION OF AN INTEGRATED DETECTION SYSTEM FOR CONTAMINATION MONITORING OF RESPIRATORS HAS BEEN PROBLEMATIC. BECAUSE OF THE COMPLEX SURFACES, HAND MONITORING USING PORTABLE SURVEY INSTRUMENTATION HAS BEEN THE PREFERRED METHOD. HAND MONITORING IS COSTLY IN TIME AND OFTEN FAILS TO RELIABLY ACHIEVE A GIVEN DETECTION LIMIT BECAUSE OF VARIABLES SUCH AS SURVEY SPEED ANDDISTANCE FROM THE PROBE. THE ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  7. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  8. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    TWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.

    SBIR Phase II 1990 Nuclear Regulatory Commission
  9. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    SEVERAL STATES ARE CURRENTLY SEEKING MUCH-NEEDED NEW LOW-LEVEL RADIOACTIVE DISPOSAL SITES IN ACCORDANCE WITH THE LOW-LEVEL RADIOACTIVE WASTE POLICY ACT OF 1980. ANY NEW COMMERCIALREQUIREMENT THAT A SITE BE CAPABLE OF BEING MODELED AND THATITS PERFORMANCE BE ASSURED FOR 500 YEARS. FOR MOST SITES, THE HYDROGEOLOGICAL AND RADIONUCLIDE TRANSPORT CHARACTERIS- TICS OF THE UNSATURATED ZONE ARE MAJOR FACT ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government