You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Abductive Power System Control and Diagnostics
SBC: ABTECH CORPORATION Topic: N/AThe objective of this effort is to demonstrate a superior prototype diagnostic system and controller for electrical power systems based on AbTech's abductive polynomial network technology. This technology enables designers to semi-automatically model the complex and dynamic behavior of very sophisticated aerospace power systems using models comprised of a network of polynomial equations (abductive ...
SBIR Phase II 1995 National Aeronautics and Space Administration -
Aim Telemetry Expert Analyst & Monitor
SBC: ABTECH CORPORATION Topic: N/AN/A
SBIR Phase I 1995 National Aeronautics and Space Administration -
Advanced Flight Control Diagnostics And Reconfiguration
SBC: ABTECH CORPORATION Topic: N/AN/A
SBIR Phase I 1995 National Aeronautics and Space Administration -
Aim Telemetry Expert Analyst & Monitor
SBC: ABTECH CORPORATION Topic: N/AN/A
SBIR Phase II 1996 National Aeronautics and Space Administration -
A Gps-Based Attitude Determining System To Aid High Dynamic Flight Test Data Analysis
SBC: Adroit Systems, Inc. Topic: N/AN/A
SBIR Phase I 1995 National Aeronautics and Space Administration -
An Innovative Pulse Detonation Rocket Engine
SBC: Adroit Systems, Inc. Topic: N/AN/A
SBIR Phase I 1995 National Aeronautics and Space Administration -
SOFT HUB FOR BEARINGLESS ROTORS
SBC: Advanced Technologies, Inc Topic: N/ATHE ROTARY WING INDUSTRY HAS STRIVED TO DEVELOP A BEARINGLESS MAIN ROTOR (BMR), HAVING NO MECHANICAL BEARINGS. ALL TRUE BMR SYSTEMS ARE LIMITED BY THE STRENGTH IN STATIC-FATIGUE LOADS VERSUS FLAPWISE FLEXIBILITY, RESULTING IN LIMITED "G" MANEUVERS FROM A HIGHLY RESPONSIVE ROTOR SYSTEM. ATI'S SOFT HUB ROTOR CONCEPT ALLOWS TILTING OF THE ROTOR DISC MOVING THE VIRTUAL HINGE INBOARD ELIMINATING THIS U ...
SBIR Phase I 1990 National Aeronautics and Space Administration -
Seven-Sensor Probes For Dusty And/Or Compressible Flows
SBC: AEROPROBE CORPORATION Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
An Unstructured Gasp Flow Solver For Use In The Design Of Liquid And Solid Rocket Engines
SBC: AEROSOFT INC Topic: N/AN/A
SBIR Phase I 1995 National Aeronautics and Space Administration -
A Stand-Alone Sensitivity Solver For Hypersonic Design Applications
SBC: AEROSOFT INC Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration