You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Directed Reflectivity, Long Life AMTEC Condenser

    SBC: ADVANCED MODULAR POWER SYSTEMS            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  2. Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  3. A URANIUM CARBIDE/RHENIUM THERMIONIC FUEL ELEMENT

    SBC: Applied Sciences Inc.            Topic: N/A

    A THERMIONIC FUEL ELEMENT (TFE) BASED ON ADVANCED URANIUM CARBIDE (UC) SOLID SOLUTION FUEL WITH RHENIUM EMITTER CLADDING SHOULD ALLOW MUCH BETTER PERFORMANCE THAN PRESENT DESIGNS. THE FUEL FORM WOULD BE A LONG, THIN, HOLLOW "VERMICELLI" SHAPE TO ALLOW VERY COMPACT REACTORS TO BE DESIGNED, DESPITE THE HIGH NEUTRON ABSORPTION CROSS SECTION OF RHENIUM. RHENIUM IS EXPECTED TO BE COMPLETELY COMPATIBLE ...

    SBIR Phase I 1992 Department of Energy
  4. REFRACTORY METAL COATINGS ON CARBON/CARBON COMPOSITES FOR FIRST WALL APPLICATIONS

    SBC: Applied Sciences Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Energy
  5. Controlled Atmosphere Plasma Spraying of NdFeB Magnet Materials

    SBC: APS Materials, Inc.            Topic: N/A

    53 Controlled Atmosphere Plasma Spraying of NdFeB Magnet Materials--APS Material, Inc., 4011 Riverside Drive, Dayton, OH 45405-2364; (937) 278-6547 Mr. Michael C. Wilson, Principal Investigator Mr. Joseph T. Cheng, Business Official DOE Grant No. DE-FG02-97ER82328 Amount: $75,000 Permanent magnet materials with improved properties are needed for a variety of applications ranging from large ele ...

    SBIR Phase I 1997 Department of Energy
  6. A THREE-DIMENSIONAL MAPPING AND INSPECTION SYSTEM FOR INSIDE-TANK ROBOTICS APPLICATIONS

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Energy
  7. Rapid GC Analysis of Samples Desorbed from Personal Monitors for Occupational Exposure Assessment

    SBC: Chromatofast, Inc.            Topic: N/A

    27 Rapid GC Analysis of Samples Desorbed from Personal Monitors for Occupational Exposure Assessment--Chromatofast, Inc., 912 North Main Street, Suite 14, Ann Arbor, MI 48104-1035; (313) 662-3410 Dr. Mark A. Klemp, Principal Investigator Mr. Robin F. Risser, Business Official DOE Grant No. DE-FG02-97ER82348 Amount: $75,000 Determining the level of chemical contaminants to which workers may be ...

    SBIR Phase I 1997 Department of Energy
  8. Active Shaping of Terawatt Pulses

    SBC: CLARK-MXR, INC.            Topic: N/A

    147 Active Shaping of Terawatt Pulses--Clark-MXR, Inc., P.O. Box 339, Dexter, MI 48130-0339; (313) 426-6265 Dr. Mark Dugan, Principal Investigator Dr. Philippe Bado, Business Official DOE Grant No. DE-FG02-97ER82352 Amount: $74,871 Advanced accelerators for high energy physics research based on high intensity lasers may be significantly less expensive than traditional designs. Consequently t ...

    SBIR Phase I 1997 Department of Energy
  9. FEASIBILITY OF AN ULTRA-CENTRIFUGE FOR DRYING COMMINUTED DEEP CLEANED COAL

    SBC: Coal Tech Corp.            Topic: N/A

    THE DEEP CLEANING PROCESSES NOW UNDER INVESTIGATION FOR COAL MOST OFTEN INVOLVE PULVERIZING AND THE USE OF A LIQUID PROCESS MEDIUM. IF THE VERY FINE DEEP CLEANED COAL IS TO BE USED IN A DRY FORM, A SATISFACTORY DRYING TECHNOLOGY IS VITAL. PREVIOUS STUDIES HAVE INDICATED A SUBSTANTIAL PROBABILITY OF SUCCESS IF THE ULTRAHIGH LEVELS OF CENTRIFUGE GRAVITY ARE COMBINED WITH THE CENTRIFUGAL DECANTING/FI ...

    SBIR Phase I 1992 Department of Energy
  10. A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles

    SBC: Commercial Electronics, Inc.            Topic: N/A

    86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...

    SBIR Phase I 1997 Department of Energy
US Flag An Official Website of the United States Government