You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. OPERATOR-BASED METRIC FOR NUCLEAR OPERATIONS AUTOMATION ASSESSMENT

    SBC: Charles River Analytics, Inc.            Topic: N/A

    THE OBJECTIVE OF THE PHASE I EFFORT IS TO DEVELOP, IMPLEMENT, AND EVALUATE AN OPERATOR-BASED METRIC FOR ASSESSING FUTURE CONTROL ROOM AUTOMATION SYSTEMS FOR COMMERCIAL NUCLEAR PLANT OPERATIONS. THE FOCUS WILL BE ON AUTOMATION'S IMPACT ON OPERATOR UNDERLOAD AND SITUATION AWARENESS (SA). THE APPROACH COMBINES AN OPERATOR/SYSTEM BEHAVIORAL REPRESENTATION IMPLEMENTEDIN SOFTWARE, WITH A PROCEDURAL METH ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  2. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  3. TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS

    SBC: Micro Analysis & Design Inc            Topic: N/A

    N/A

    SBIR Phase I 1991 Nuclear Regulatory Commission
  4. HIGH SENSITIVITY LANDFILL MONITOR

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1991 Nuclear Regulatory Commission
  5. SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1993 Nuclear Regulatory Commission
  6. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  7. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  8. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  9. CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING

    SBC: Atkinson-noland Assoc. Inc.            Topic: N/A

    N/A

    SBIR Phase I 1993 Nuclear Regulatory Commission
  10. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government