You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    WE PROPOSE TO EXPLOIT THE PROPERTIES OF OUR NEW, FAST, BRIGHT SCINTILLATOR, YAIO3:CE(+3) (YAP), TO CONSTRUCT A DETECTOR FOR PHOTONS WITH ENERGIES FROM 20 KEV TO 3 MEV. AN ARRAY OF THESE INDIVIDUAL DETECTORS WILL SERVE AS THE BASIS FOR A BROAD-BAND Y-RAY DOSIMETER CAPABLE OF MEASURING EXPOSURES FROM 5 MR/H TO 1 R/H AND EQUIVALENT DOSES FROM 5 X 10(-2) TO 10 (+4) MSV/H. THEA ADVANTAGES OF YAP SCINTI ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  2. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  3. ENHANCED REMOVAL OF RADIOACTIVE PARTICLES BY FLUOROCARBON SURFACTANT SOLUTIONS

    SBC: Entropic Systems, Inc.            Topic: N/A

    THE PROPOSED RESEARCH ADDRESSES THE APPLICATION OF ESI'S ENHANCED PARTICLE REMOVAL TO THE NON-DESTRUCTIVE DECONTAMINATION OF NUCLEAR EQUIPMENT. IN THIS PROCESS, THE PART TO BE CLEANED IS CONTACTED, UNDER CONDITIONS OF SHEAR, WITH A SOLUTION OF A HIGH MOLECULAR WEIGHT FLUOROCARBON SURFACTANT IN AN INERT PERFLUORINATED LIQUID. IT IS THEN RINSED WITH PERFLUORINATED LIQUID AND AIR DRIED. THE PERFLUORI ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  4. DEVELOPMENT OF A CONTAMINATION MONITOR USING VISUAL IDENTIFICATION

    SBC: Shonka Research Associates            Topic: N/A

    THIS PROJECT WILL RESEARCH AND DEVELOP A FLOOR MONITOR FOR QUICK DETERMINATION OF RADIOACTIVE CONTAMINATION. THE MONITOR WILL UTILIZE A NEW PORTABLE TECHNOLOGY (INCLUDING SUPPORT ELECTRONICS). IT WILL HAVE THE CAPABILITY TO MEASURE BETA CONTAMINATION BELOW 5000 DPM/100 CM SQUARED WHEN AVERAGED OVER ONE SQUARE METER AND COVER AN AREA AS LARGE AS SEVERAL SQUARE FEET PER SECOND. IT WILL ALSO BE CAPAB ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  5. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  6. OPERATOR-BASED METRIC FOR NUCLEAR OPERATIONS AUTOMATION ASSESSMENT

    SBC: CHARLES RIVER ANALYTICS, INC.            Topic: N/A

    THE OBJECTIVE OF THE PHASE I EFFORT IS TO DEVELOP, IMPLEMENT, AND EVALUATE AN OPERATOR-BASED METRIC FOR ASSESSING FUTURE CONTROL ROOM AUTOMATION SYSTEMS FOR COMMERCIAL NUCLEAR PLANT OPERATIONS. THE FOCUS WILL BE ON AUTOMATION'S IMPACT ON OPERATOR UNDERLOAD AND SITUATION AWARENESS (SA). THE APPROACH COMBINES AN OPERATOR/SYSTEM BEHAVIORAL REPRESENTATION IMPLEMENTEDIN SOFTWARE, WITH A PROCEDURAL METH ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  7. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  8. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    THIS PROJECT IS AIMED AT DEVELOPING TECHNIQUES FOR PREDICTING CHECK VALVE PERFORMANCE AND ITS INTERNAL COMPONENTS DEGRADATION IN PRACTICAL PIPING SYSTEMS USED IN NUCLEAR POWER PLANTS. THE MAIN FOCUS OF THE EFFORT IS TO SYSTEMATICALLY EVALUATE THE EFFECT OF UPSTREAM DISTURBANCES WHICH ARE WITHIN 10 DIAMETERS UPSTREAM. BY USING A COMBINED THEORETICAL AND EXPERIMENTAL APPROACH, GENERALIZED NONDIMENSI ...

    SBIR Phase II 1988 Nuclear Regulatory Commission
  9. SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1993 Nuclear Regulatory Commission
  10. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government