You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. CENTERLINE IMAGING SYSTEM FOR END EFFECTOR TOOLS

    SBC: Olis Engineering            Topic: N/A

    THE PURPOSE OF THIS PROPOSED RESEARCH IS TO DEVELOP A TRUE CENTERLINE IMAGING SYSTEM FOR USE WITH END EFFECTOR TOOLS. THE NEED FOR THIS TYPE OF IMAGING SYSTEM WAS IDENTIFIED DURING THE COURSE OF A PREVIOUS STUDY TO DEVELOP INFLATABLE END EFFECTORS FOR HANDLING DELICATE COMPOSITE STRUCTURAL COMPONENTS. ONE OF THE INFLATABLE END EFFECTOR TOOLS DEVELOPED SHOWS PROMISE FOR THE ADDITION OF A CENTERLINE ...

    SBIR Phase I 1989 National Aeronautics and Space Administration
  2. Nih2 Spacecraft Batteries With Effective Performance > 100 W-Hr/Kg

    SBC: BOUNDLESS CORP.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  3. Advanced Microwave Imaging Techniques for Materials Processing and Monitoring

    SBC: GEMTECH Microwaves            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  4. AN AUTOMATIC SCHEDULING ASSISTANT FOR THE NASA SPACE STATION

    SBC: INNOVATIVE RESEARCH, INC.            Topic: N/A

    THE PROPOSED NASA SPACE STATION HAS SEVERAL CLASSES OF ACTIVITIES, MOST OF WHICH WILL BE AUTOMATED. SINCE THE FIRST PHASE OF AUTOMATION WILL BE CENTERED AROUND A SET OF TELEOPERATED ROBOTS, THE CREWMEMBERS WILL PLAY AN INTEGRAL PART IN ALL AUTOMATED ACTIVITIES. THESE ACTIVITIES WILL HAVHAVE TO BE SCHEDULED SUBJECT TO NUMEROUS METERIAL AND LABOR RESOURCE CONSTRAINTS. THIS SCHEDULING TASK WOULD BE V ...

    SBIR Phase I 1989 National Aeronautics and Space Administration
  5. NASA Quality-Assurance Data-Collection-Network Prototype

    SBC: SENTEL CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  6. Sensor Performance Enhancements for Process-Control, Water-Quality Monitor for Space Application

    SBC: Astro International            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  7. III-V Semiconductor Infrared Bulk Materials for 8-12 Micron Range

    SBC: Microgravity Research            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  8. SENSORS FOR FLIGHT RESEARCH

    SBC: Research Innovation Implement            Topic: N/A

    POLYMERIC PRINTED CIRCUIT BOARD TECHNOLOGY HAS PROGRESSED TO A STAGE WHERE RESISTORS, CAPACITORS, INDUCTORS, AND EVEN DIODES CAN BE FORMED AS MICRO-SCALE COMPONENTS WHILE INTERCONNECTING IC'S. THIS TECHNOLOGY HAS BEEN ADVANCED BY USING COMPUTER CONTROLLED CAM, POLYMER ADDITIVE AND SUBTRACTIVE METHODS OF MULTI-LAYER CHIP INTERCONNECT. BY USING THIS METHOD, EVEN MICRO-SCALE DEVICES CAN BE FABRICATED ...

    SBIR Phase I 1989 National Aeronautics and Space Administration
  9. Active Microwave Elements for Space Station Food Preparation Systems

    SBC: APTEK, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  10. Charge-Coupled Device and CMOS High-Efficiency, Low-Voltage Regulator

    SBC: Q-DOT, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government