You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Balloon Assisted Launch System

    SBC: Winzen Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseAir Force
  2. Abductive Electronics Prognostic Tool (ADEPT)

    SBC: ABTECH CORPORATION            Topic: N/A

    AbTech Corporation proposes to apply its unique Statistical Network ModelingTM technology to develop a non contact prognostic assessment tool that 1) acquires, processes, and analyzes electronic radiated signal data, 2) learns the expected characteristics and patterns of specific radiated signals measured from microelectronic semiconductor devices using AbTech's statistical network modeling techno ...

    SBIR Phase I 1997 Department of DefenseAir Force
  3. ABR with Low Bandwidth ATM

    SBC: SCIENTIFIC RESEARCH CORP.            Topic: N/A

    This proposal has three main efforts:1. Extension of the ATM Forum ABR protocol to allocate bandwidth according to quality of service (QoS) and priority level of the individual connection. This project will utilize the informational bits provided by the fields to support QoS and priority level acknowledgment.2. Design of an ATM application that utilizes the ABR service via an application programme ...

    SBIR Phase I 1997 Department of DefenseAir Force
  4. A CAD-NDE Translator (CADNET) for the Ultrasonic Inspection of Contoured Ceramic Gas Turbine Components

    SBC: KARTA TECHNOLOGIES            Topic: N/A

    The automated inspection of gas turbine components has proven to be difficult due to their complex geometry. While ultrasonics has demomstrated excellent capabilities in detecting and characterizing the erosion and corrosion on turbine components from the hot effluent gases, it's application details laborious alignment procedures for the ultrasonic transducer during inspection. The need for automa ...

    SBIR Phase I 1993 Department of DefenseArmy
  5. Accelerated Reliability Testing for Environmental Control Systems

    SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC.            Topic: N/A

    Reliability and lifetime performance data for environemntal control systems (ECS) is limited. Real-time tests require 5-15 years, and results often apply only to obsolete technology. Accelerated life testing (ALT) is a means by which reliability data may be obtained quickly and at a reasonable cost. A primary difficulty with ALT of ECS units is that typical service conditions impose multiple stres ...

    SBIR Phase I 1993 Department of DefenseArmy
  6. ACCURATE PASSIVE RANGING TECHIQUES

    SBC: ASTRON WIRELESS TECHNOLIGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseNavy
  7. A Comprehensive System for the Prevention and Remediation of Biofilms in Dental Equipment

    SBC: LYNNTECH INC.            Topic: N/A

    There is a substantial body of evidence demonstrating that biofilms growing inside the water lines of dental units pose a significant risk as a source of infection. The problem has been recognized by practitioners, regulators, manufacturers, and the ADA, with the ADA proposing a set of guidelines for water quality that include a limit of 200 colony forming units per milliliter for the year 2000. ...

    SBIR Phase I 1997 Department of DefenseAir Force
  8. A Configurable Object-Oriented Expert System to Embody Cultural (Awareness) Models for Simulation and Semi-Autonomous Forces

    SBC: AURORA SIMULATION, INC.            Topic: N/A

    One of the biggest problems faced by both military and non-military personnel in planning and conducting Operations Other Than War (OOTW) and Law Enforcement (LE) is a lack of cultural awareness. A lack of cultural awareness in OOTW causes misplanning and misinterpretation in the areas of economics, politics, religion, and historical events. The objective of the proposed work is to produce a des ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  9. A Context-based Approach to Training and Aiding Situation Awareness

    SBC: SEARCH TECHNOLOGY, INC.            Topic: N/A

    Situation awareness has been recognized as an important contributor to aviation performance. Pilot training should therefore highlight the role of situation awareness in the operational environment. This should focus on timely, critical, information seeking and processing behaviors needed for acquiring and maintaining situation awareness. Such training may be accomplished by exposing the studen ...

    SBIR Phase I 1997 Department of DefenseAir Force
  10. ACOUSTIC DIRECTION AND RANGE TRANSDUCER FOR DIVERS

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseNavy
US Flag An Official Website of the United States Government