You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. EMP AND HPM SUPPRESSION TECHNIQUES

    SBC: Integrated Sciences            Topic: N/A

    Survival of present day microelectronic circuits depends on their protection from self generated and external electromagnetic interference. This proposal is oriented toward the class of interference generally referred to as overvoltage transients. Means for mitigating these transients include gas discharge tubes, and various solid state devices. Each of these has their own advantages in particu ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  2. Speed-Accuracy Measures for Distributed Interactive Simulation of Nuclear Weapons Effects

    SBC: Pacific-sierra Research Corp.            Topic: N/A

    Using distributed interactive simulation (DIS) to conduct effective training, analyses, or mission support in a tactical nuclear weapons effects (NWE) environment requires realistic computer generated forces (CGF) that are sensitive to such effects. This level of sensitivity requires CGF to apply valid and reliable speed-accuracy measures of environmental effects on human performance within the D ...

    SBIR Phase I 1997 Department of DefenseDefense Threat Reduction Agency
  3. LONGWAVE ELECTROMAGNETIC SENSOR FOR COUNTERPROLIFERATION ACTIVITIES

    SBC: Pacific-sierra Research Corp.            Topic: N/A

    We propose to design a compact, multiple purpose electromagnetic sensor for monitoring the extremely low frequency (ELF), very low frequency (VLF), and low frequency (LF) spectrum. Our goal is to design a modular, low cost sensor capable of being configured for multiple applications and capable of being employed in remote, unattended sensor networks. We describe three applications or scenarios t ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  4. TUNNEL HARDENING THROUGH INNOVATIVE ROCK BOLTS AND SHOTCRETE LINERS

    SBC: UTD, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseDefense Threat Reduction Agency
  5. ANALYSIS OF NUCLEAR WEAPONS EFFECTS ON STRATEGIC STRUCTURES

    SBC: Engineering & Economics Rsrch            Topic: N/A

    SUBSTANTIAL PROGRESS HAS BEEN MADE IN RECENT YEARS TO DEVELOP AND VALIDATE MODELS WHICH CAN PREDICT THE PHYSICAL EFFECTS OF NUCLEAR WEAPONS ON STRATEGIC STRUCTURES. SIGNIFICANT UNCERTAINTIES REMAIN, HOWEVER, IN THE CONFIDENCE LEVELS ATTRIBUTABLE TO THESE PREDICTIVE CAPABILITIES. THIS APPROACH WOULD IDENTIFY AND PRIORITIZE THOSE ACTIVITIES, ALONG WITH THEIR ASSOCIATED BUDGETARY AND SCHEDULING CONSI ...

    SBIR Phase I 1987 Department of DefenseDefense Threat Reduction Agency
  6. NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT

    SBC: ANALYSIS AND MEASUREMENT SERVICES CORPORATION            Topic: N/A

    THIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  7. ASSESSMENT OF SMART SENSOR TECHNOLOGIES FOR CONVENTIONAL ANDADVANCED LWRS

    SBC: ANALYSIS AND MEASUREMENT SERVICES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1991 Nuclear Regulatory Commission
  8. EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS

    SBC: ANALYSIS AND MEASUREMENT SERVICES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  10. LASER INDUCED FLUORESCENCE MEASUREMENTS OF MAGNETIC FIELD CONTOURS IN HIGH CURRENT DEVICES

    SBC: HY-Tech Research Corp.            Topic: N/A

    THE DISTRIBUTION OF THE MAGNETIC FIELD IN A HIGH CURRENT PLASMA DEVICE PROVIDES IMPORTANT INFORMATION ABOUT THE DEVICES OPERATION. TRADITIONAL FARADAY ROTATION, ZEEMAN EMISSION SPECTROSCOPY, AND MAGNETIC PROBE TECHNIQUES SUFFER FROM POOR SPATIAL RESOLUTION BECAUSE THE MAGNETIC FIELD EFFECT IS INTEGRATED ALONG THE LINE OF SIGHT FOR THE OPTICAL TECHNIQUE AND THE PROBES PERTURB THE PLASMAS. A LASER I ...

    SBIR Phase I 1987 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government