You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
WIDEBAND ACTIVE SONAR BEAMFORMING
SBC: DIGITAL SYSTEM RESOURCES, INC. Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseNavy -
Wearable Electronics for Man Machine Interfaces
SBC: CARLOW INTERNATIONAL, INC. Topic: N/AComputing technology (as well as control and display technology) is rapidly becoming more powerful, miniaturized and wearable. These trends will allow Navy personnel to be increasingly mobile, not tethered to hardwired console and computer systems. In conjunction with wearable display systems, wireless LANs, and alternative control mechanisms (such as voice recognition), system operators may, ...
SBIR Phase I 1996 Department of DefenseNavy -
VME bus Reliability/Test Tools
SBC: PROGENY SYSTEMS, LLC Topic: N/AN/A
SBIR Phase I 1996 Department of DefenseNavy -
VLF Assisted Position Estimation and Resolution for Surface Ships (VAPERSS)
SBC: EXPEDITION TECHNOLOGY, INC. Topic: N211052We propose VLF Assisted Position Estimation and Resolution for Surface Ships (VAPERSS) to develop a capability to estimate position and velocity from very low frequency (VLF) signals of opportunity (SoOps) on a US NAvy surface vessel. Specifically, we propose to develop a candidate set of algorithms and system architecture which will 1) validate our concept of a global ionospheric propa ...
SBIR Phase I 2021 Department of DefenseNavy -
VERY LOW BIT-RATE ERROR-RESILIENT VIDEO COMMUNICATION
SBC: Summitec Corp. Topic: N/AN/A
SBIR Phase I 1996 Department of DefenseNavy -
VALIDATION & TESTING OF THE VAM2D COMPUTER CODE
SBC: Hydrogeologic Inc. Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
USW-DSS Coalition Data Parser & 4D Display
SBC: Northstrat Incorporated Topic: N211046Northstrat’s proposal for the US Navy’s Naval Sea Systems (NAVSEA) N211-046 SBIR Topic, “Undersea Warfare Decision Support System Coalition Data Parser & Advanced Display” details how Northstrat envisions helping to address shortcomings in the AN/UYQ 100 Undersea Warfare Decision Support System (USW-DSS). The proposal describes Northstrat’s vision for creating a 4D display ...
SBIR Phase I 2021 Department of DefenseNavy -
Use of Si3N4 as the Dielectric Gate Layer for Wide Bandgap Semiconductor Devices
SBC: Systems & Processes Engineering Corporation Topic: N/AOne of the most important problems to overcome for the development of wide bandgap metal insulator semiconductor (MIS) technology is development of high-quality gate dielectric layers. Systems & Processes Engineering Corporation (SPEC), in collaboration with the University of Texas at Austin, proposes to use deposited silicon nitride as the dielectric gate layer for wide bandgap semiconductor ...
SBIR Phase I 1997 Department of DefenseNavy -
UAV Laser MAD System
SBC: POLATOMIC, INC. Topic: N/AThis Small Business Innovation Research Phase I project will establish the feasibility of integrating a small, light weight MAD sensor and signal processing technology with an UAV platform for shallow water and land surveillance. Polatomic's approach utilizes a miniature laser magnetometer concept and technology developed under SBIR contracts from NASA, NSF and the Navy. The laser magnetometer ...
SBIR Phase I 1997 Department of DefenseNavy -
UAV-Hosted UltraShort Pulse Ground Penetrating Radar
SBC: Barrett, Terence William Topic: N/AA ground penetrating radar (GPR) with advanced processing techniques is proposed for unmanned aerial vehicle mounting. The radar will have two modes of functioning: (A) detection mode, and (B) imaging mode. Precise position accuracy is required for a gridwork of multiple probings and GPS P-Code can provide sub-meter location accuracy. The system design will take advantage of recent develo ...
SBIR Phase I 1996 Department of DefenseNavy