You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    THIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  3. EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS

    SBC: Applied Biomathematics Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  5. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  6. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  7. DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR

    SBC: K E M P CORP            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  8. DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS

    SBC: Mikayola International            Topic: N/A

    AN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  9. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  10. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government