You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Abductive Electronics Prognostic Tool (ADEPT)

    SBC: ABTECH CORPORATION            Topic: N/A

    AbTech Corporation proposes to apply its unique Statistical Network ModelingTM technology to develop a non contact prognostic assessment tool that 1) acquires, processes, and analyzes electronic radiated signal data, 2) learns the expected characteristics and patterns of specific radiated signals measured from microelectronic semiconductor devices using AbTech's statistical network modeling techno ...

    SBIR Phase I 1997 Department of DefenseAir Force
  2. ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    IN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...

    SBIR Phase I 1991 Department of DefenseArmy
  3. Accurate Automation Corporation Fuzzy Logic/ Neural Network Processor

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    In this project we will adapt our programmable neural network processor (NNP) into a Fuzzy/neural network processor (FNNP). Already having the commercially successful NNP, we begin this program with more than half the work completed. we will define and evaluate NNP architectural modifications to optimize both data flow and data processing for both fuzzy logic and neural network- Operations- we w ...

    SBIR Phase I 1996 Department of DefenseNavy
  4. A CENTER FREQUENCY/BANDWIDTH DETECTOR

    SBC: Fastman, Inc.            Topic: N/A

    THE GOAL OF THIS RESEARCH IS TO DEVELOP A PROCESSOR WHICH USES TIME-FREQUENCY TRANSFORMS TO EXTRACT THE INSTANTANEOUS FREQUENCY OF A SIGNAL IN REAL TIME. IN THE PROCESSOR, THE SIGNAL WILL BE SPLIT INTO TWO PATHS. IN ONE PATH THE SIGNAL WILL BE DIRECTED TO A DELAY LINE AND THEN TO PROGRAMMABLE FILTERS. IN THE OTHER PATH, THE SIGNAL WILL BE DIRECTED TO OUR TIME-FREQUENCY DETECTOR WHICH WILL MEASURE ...

    SBIR Phase I 1991 Department of DefenseArmy
  5. A Comprehensive System for the Prevention and Remediation of Biofilms in Dental Equipment

    SBC: LYNNTECH INC.            Topic: N/A

    There is a substantial body of evidence demonstrating that biofilms growing inside the water lines of dental units pose a significant risk as a source of infection. The problem has been recognized by practitioners, regulators, manufacturers, and the ADA, with the ADA proposing a set of guidelines for water quality that include a limit of 200 colony forming units per milliliter for the year 2000. ...

    SBIR Phase I 1997 Department of DefenseAir Force
  6. A Concept Employment Trainer (CET) for Sonar Operations

    SBC: CHI SYSTEMS INC            Topic: N/A

    Computer-based training has primarily focused on the acquisition and application of procedural knowledge, emphasizing development of skilled performance of tasks. In many important Naval roles, however, the ability to apply more general concept to specific novel problems is even more important than procedural skills. Sonar operators, who must reason about acoustic oceanography and sensor/s ...

    SBIR Phase I 1996 Department of DefenseNavy
  7. A Configurable Object-Oriented Expert System to Embody Cultural (Awareness) Models for Simulation and Semi-Autonomous Forces

    SBC: AURORA SIMULATION, INC.            Topic: N/A

    One of the biggest problems faced by both military and non-military personnel in planning and conducting Operations Other Than War (OOTW) and Law Enforcement (LE) is a lack of cultural awareness. A lack of cultural awareness in OOTW causes misplanning and misinterpretation in the areas of economics, politics, religion, and historical events. The objective of the proposed work is to produce a des ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  8. ACOUSTIC TOWED ARRAY MOTION DETERMINATION USING HYDRODYNAMICS AND AMBIENT NOISEFIELDS

    SBC: DIGITAL SYSTEM RESOURCES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseNavy
  9. Acoustic Towed Array Position Measurement System for Nuclear Submarines

    SBC: DDL Omni Engineering, LLC            Topic: N/A

    DDL OMNI Engineering proposes to design a secure system for the continuous, real time acoustic measurement of towed array position relative to the host submarine. By using focused transmit and receive assemblies, pseudo- random spread broadband signals, and relatively high carrier frequency, the transmission level will be minimized so as to be virtually undetectable by a non-dedicated system ...

    SBIR Phase I 1997 Department of DefenseNavy
  10. Acousto-Ultrasonic Method for the Detection of Adhesive Bond Integrity

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    Composite materials find increasing importance as structural materials for modern lightweight and low cost aircraft. Structures using composite materials essentially rely on the integrity of adhesive bonds for their structural stability. A major limitation in employing composites in critical structures is that the existing methods of testing the integrity of structures are not adequate to a ...

    SBIR Phase I 1996 Department of DefenseNavy
US Flag An Official Website of the United States Government