You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A PERSONALIST APPROACH TO ESTIMATING POPULATIONS OF INSTITU-TIONS
SBC: Decision Science Associates Topic: N/AN/A
SBIR Phase I 1986 National Science Foundation -
AN INNOVATIVE USE OF PULSED POWER TECHNOLOGY FOR SEPARATING MINERALS FROM ORES
SBC: Tetra Corporation Topic: N/AN/A
SBIR Phase I 1990 National Science Foundation -
IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER
SBC: Shonka Research Associates Topic: N/ATHE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
ADA QUALITY TOOLSET
SBC: Software Design & Analysis Inc Topic: N/AN/A
SBIR Phase I 1990 National Science Foundation -
COHESIONLESS SOIL AND SMALL DISCONTINUOUS REINFORCING ELEMENTS IN COMPOSITE ENGINEERING MATERIALS
SBC: Earthwater Corp. Topic: N/AN/A
SBIR Phase I 1990 National Science Foundation -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
NONINTRUSIVE PHOTOACOUSTIC CHARACTERIZATION OF CRITICAL PROPERTIES IN HIGH TC SUPERCONDUCTING MATERIALS
SBC: American Research Corporation of Virginia Topic: N/ATHE RECENT DISCOVERY OF NEW HIGH TEMPERATURE SUPERCONDUCTOR SYSTEMS HAS CREATED A NEED TO DEVELOP COMPATIBLE MEASUREMENTTECHNIQUES TO CHARACTERIZE THE ELECTRICAL, STRUCTURAL, ACOUSTIC AND OPTICAL PROPERTIES OF THESE MATERIALS. ALTHOUGH MANY STANDARD METHODS OF MEASURING CONVENTIONAL SUPERCONDUCTING MATERIALS CAN BE ADAPTED TO NEW HIGH TC SUPERCONDUCTOR SYSTEMS, EFFECTIVE MEASUREMENT OF CRITICAL PR ...
SBIR Phase I 1990 National Science Foundation -
LASER-DRIVEN DIRECTIONAL SOLIDIFICATION IN HIGH TC SUPERCONDUCTING FIBERS
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1990 National Science Foundation -
THESEUS: A NEW PLATFORM FOR HIGH-ALTITUDE ATMOSPHERIC SCIENCE
SBC: AURORA FLIGHT SCIENCES CORPORATION Topic: N/AN/A
SBIR Phase I 1990 National Science Foundation -
"RELIEF OF ENERGY TRANSFER LIMITATIONS IN ELECTRICAL POWER SYSTEMS"
SBC: Ecc Inc. Topic: N/AN/A
SBIR Phase I 1990 National Science Foundation