You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. SURVEY OF TRANSIT-TIME AMPLIFIERS FOR APPLICATIONS TO HIGH ENERGY PHYSICS ACCELERATORS

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    HIGH POWER TRANSIT-TIME AMPLIFIERS ARE A NEW CLASS OF RF SOURCE THAT CONVERTS THE KINETIC ENERGY OF AN ELECTRON BEAM INTO RF RADIATION IN A VERY EFFICIENT WAY. WHEN THE BEAM CROSSES THE CAVITY OF PROPER DIMENSIONS, IT WILL INTERACT WITH A SINGLE CAVITY MODE THEREBY RADIATING COHERENTLY AT THE MODE'S FREQUENCY. MODE GROWTH CONTINUES UNABATED UNTIL THE RF FIELDS ARE LARGE ENOUGH TO MODIFY THE BEAM O ...

    SBIR Phase I 1990 Department of Energy
  2. FIBER OPTIC LONG COUNTER

    SBC: FIBERTEK, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  3. IMPROVED ENHANCED OIL RECOVERY PROCESSES USING NEW AND NOVEL SYNTHETIC COPOLYMERS CONTAINING LARGE AMOUNTS OF ACRYLAMIDE

    SBC: R. L. Clampitt And            Topic: N/A

    INDEPENDENTS IN THE MID-CONTINENT AREA INCLUDING OKLAHOMA AND KANSAS, NEED A NEW AND NOVEL WATER SOLUBLE POLYMER FOR INDEPTH MOBILITY CONTROL IN ENHANCED OIL RECOVERY (EOR) PROCESSES AT INTERMEDIATE TEMPERATURES OF 165 TO 200 FAHRENHEIT. PARTIALLY HYDROLYZED POLYACRYLAMIDES AND NATURAL POLYMERS HAVE HISTORICALLY BEEN THE PRODUCTS USED IN THIS REGION. AND IN ESSENTIALLY ALL OF THE EARLIER EOR PROJE ...

    SBIR Phase I 1990 Department of Energy
  4. BIOBASED GRAFT POLYMER REINFORCED POLYPROPYLENE COMPOSITES

    SBC: Southeastern Reduction Co            Topic: N/A

    BLENDS OF BIOBASED FIBER SOURCES ARE MANUFACTURED AND CHARACTERIZED BY ASPECT RATIO FOR OPTIMUM PERFORMANCE IN A BIOBASED GRAFT POLYMER AS MEASURED BY MECHANICAL PROPERTIES AND SURFACE MORPHOLOGY IN COMPRESSION MOLDED TEST SPECIMENS. FROM 18 FORMULATIONS OF BIOBASED GRAFT POLYMER, THREE ARE SELECTED ON THE BASIS OF BEST OVERALL PERFORMANCE AND USED IN A BIOBASED GRAFT POLYMER COMPOSITE STUDY IN CO ...

    SBIR Phase I 1990 Department of Energy
  5. A NEW ELECTROSTATIC ACCELERATOR FOR POSITRON EMISSION TOMOGRAPHY

    SBC: North Star Research Corp.            Topic: N/A

    THE OBJECTIVE OF OUR PROJECT IS TO DEVELOP NEW MEANS OF PRODUCING SHORT LIVED RADIOISOTOPES FOR POSITRON EMISSION TOMOGRAPHY (PET). THIS MEDICAL DIAGNOSTIC TECHNIQUE IS CAPABLE OF DISCERNING AND IMAGING MEDICALLY INTERESTING PHENOMENA, SUCH AS THE ACTIVITY OF VARIOUS PARTS OF THE BRAIN, OXYGEN FLOW IN THE BODY, AND OTHER QUANTITIES WHICH ARE IMPOSSIBLE TO DETERMINE BY ANY OTHER DIAGNOSTIC TECHNIQU ...

    SBIR Phase I 1990 Department of Energy
  6. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  7. HIGH-POWER TRANSVERSE-MODULATION MICROWAVE GENERATOR WITH AXIAL-FIELD CONFINEMENT

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  8. A NEW, OFF-PEAK ELECTRIC THERMAL STORAGE APPLIANCE FOR COMMERCIAL AND RESIDENTIAL USE.

    SBC: Thermal Electric Devices Inc.            Topic: N/A

    THIS COUNTRY IS FACING AN EXTREMELY DIFFICULT PROBLEM IN PROVIDING ELECTRIC ENERGY IN SUFFICIENT QUANTITIES FOR THE NEAR FUTURE. THIS PROBLEM IS COMPOUNDED, ON THE ONE HAND, BY THE VERY HIGH COST OF NUCLEAR POWER, THE EXTREMELY LONG APPROVAL AND CONSTRUCTION TIMES, AND THE SHUTTING DOWN OF SEVERAL PLANTS EVEN BEFORE START UP BECAUSE OF THE CONCERNS OF LOCAL CITIZENS. ON THE OTHER HAND, CONVENTIONA ...

    SBIR Phase I 1990 Department of Energy
  9. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  10. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government