You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. PC-BASED SYSTEM FOR THE RAPID DETERMINATION OF HPM TESTING FIDELITY IN ANECHOIC CHAMBER ENVIRONMENTS

    SBC: VOSS SCIENTIFIC LLC            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
  2. ABDUCTIVE NETWORKS FOR SPACE SURVEILLANCE AND CLASSIFICATION

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
  3. ABDUCTIVE NETWORKS FOR COMPLEX AERONAUTICAL SYSTEMS DEVELOPMENT

    SBC: ABTECH CORPORATION            Topic: N/A

    INNOVATIVE ARTIFICIAL INTELLIGENCE TECHNIQUES HAVE THE POTENTIAL TO SOLVE MANY COMPLEX AIR FORCE PROBLEMS. ADVANCES IN COMPUTING SPEED AND EXISTING SOFTWARE TECHNOLOGY ALONE ARE UNLIKELY TO RESULT IN REAL-TIME AERONAUTICAL SYSTEMS CAPABLE OF MEETING THE COMPLEX REQUIREMENTS OF THE AIR FORCE MISSION. RATHER, AN ALTERNATIVE METHODOLOGY SUCH AS ABDUCTIVE TECHNOLOGY, A NEW TECHNOLOGY PRESENTED IN THIS ...

    SBIR Phase I 1990 Department of DefenseAir Force
  4. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  6. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  7. COMMUNICATIONS SIGNAL RECOGNITION AND DEMODULATION VIA NEURAL NETWORKS

    SBC: Signal Analytics Corp            Topic: N/A

    THE GOAL OF THIS PROGRAM IS TO IDENTIFY SPECIFIC NEURAL NETWORK ARCHITECTURES AND ALGORITHMS WHICH ARE APPLICABLE TO COMMUNICATIONS PROBLEMS AND EVALUATE THOSE ARCHITECTURES AND ALGORITHMS VIA SIMULATION AND MODELING. WE DEFINE HEREIN A SYSTEM CONSISTING OF TWO DIFFERENT NEURAL NETWORK PARADIGMS WHICH ARE INTEGRATED TO PERFORM AUTOMATIC IDENTIICATION AND DEMODULATION OF DIGITAL COMMUNICATIONS SIGN ...

    SBIR Phase I 1990 Department of DefenseAir Force
  8. THE DEVELOPMENT OF AN IMPROVED CONVECTIVE INITIATION SCHEME FOR MESOSCALE NUMERICAL WEATHER PREDICTION MODELS

    SBC: MESOSCALE ENVIRONMENTAL SIMULATIONS AND OPERATIONS, INC            Topic: N/A

    A THREE-DIMENSIONAL, NONHYDROSTATIC CLOUD MODEL IS USED AS A TOOL TO INVESTIGATE THE PROBLEM OF THUNDERSTORM INITIATION. OPERATIONAL NUMERICAL MODELS DO A POOR JOB OF PREDICTING THE GEOGRAPHIC DISTRIBUTION OF CONVECTIVE ACTIVITY, ESPECIALLY DURING THE WARM SEASON, WHEN THE LARGE SCALE CIRCULATION IS RELATIVELY WEAK. THE CUMULUS PARAMETERIZATION SCHEMES USED IN CURRENT MESO-BETA-SCALE RESEARCH MODE ...

    SBIR Phase I 1990 Department of DefenseAir Force
  9. EFFECTS OF STRUCTURES ON TOXIC VAPOR DISPERSION

    SBC: SULLIVAN ENVIRONMENTAL CONSULTING INC            Topic: N/A

    THE HANDING AND STORAGE OF AIRCRAFT FUELS, ROCKET PROPELLANTS AND SOLVENTS AT AIR FORCE INSTALLATIONS CREATES THE POTENTIAL FOR ACCIDENTIAL RELEASE OF AIRBORNE POLLUTANTS. CURRENTLY AVAILABLE DISPERSION MODELS FOR PLANNING AND RESPONSE ACTIONS DO NOT EFFECTIVELYADDRESS BUILDING EFFECTS. THE OBJECTIVES OF THIS STUDY, THEREFORE, ARE TWOFOLD: (1) TO ASSESS FOR A RANGE OF RELEASE SCENARIOS THE SIGNIFI ...

    SBIR Phase I 1990 Department of DefenseAir Force
  10. INTEGRATED SAFE AND ARM

    SBC: Megadyne Inc.            Topic: N/A

    THIS OBJECTIVE OF THIS PROJECT IS TO DEVELOP AND BUILD A PROTOTYPE OF A DC TO DC VOLTAGE CONVERTER TO BE USED IN ELECTRONIC FOIL INITIATOR APPLICATIONS. THE DC TO DC CONVERTER WILL WORK AT 80% EFFICIENCY USING CURRENT MODE CHARGING. THE WORKING VOLTAGE WILL BE 2.5 KV WITH AN OVERALL POWER DENSITY OF 25 WATTS PER CUBIC INCH. THE DC TO DC REQUIRES AN DYNAMIC ENVIRONMENTAL INPUT FOR CHARGING. THIS UN ...

    SBIR Phase I 1990 Department of DefenseAir Force
US Flag An Official Website of the United States Government