You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. ADVANCED FARE PAYMENT MEDIA

    SBC: Glh Inc            Topic: N/A

    THE SBIR PROGRAM SOLICITATION PROVIDES AN OPPORTUNITY TO DESIGN AND DEVELOP A FARE PAYMENT SYSTEM BASED ON ADVANCED FARE PAYMENT MEDIA TO MEET THE NEEDS OF TRANSIT PATRONS AND SYSTEMS IN THE 1990S. THE SOLICITATION STATED THE NEW MEDIASHOULD: BE COST EFFECTIVE, PERMIT PAYMENT OF ZONAL FARES, INCREASE FLEXIBILITY IN PAYMENT SCHEDULES AND METHODS, AND IMPROVE REVENUE SECURITY AND PROCESSING CAPABILI ...

    SBIR Phase I 1991 Department of Transportation
  3. ADVANCED VACUUM INSULATION FOR REFRIGERATED SHIPPING CONTAINERS

    SBC: Re/Spec Inc.            Topic: N/A

    A RESEARCH PROGRAM IS PROPOSED TO DETERMINE THE FEASIBILITY OF USING ADVANCED VACUUM INSULATIONS TO IMPROVE THE PRODUCTIVITY OF REFRIGERATED SHIPPING CONTAINERS WHILE AVOIDING THE ENVIRONMENTAL RISKS ASSOCIATED WITH CHLOROFLUOROCARBONS (CFC'S) IN FOAM INSULATION CURRENTLY BEING USED. ADVANCED VACUUM INSULATIONS, CURRENTLY UNDER RESEARCH AND DEVELOPMENT, DO NOT CONTAIN CFC'S AND HAVE VERYHIGH THERM ...

    SBIR Phase I 1990 Department of Transportation
  4. AIRBORNE DATA LINK COCKPIT MANAGEMENT AND DISPLAY

    SBC: CARLOW INTERNATIONAL, INC.            Topic: N/A

    RESEARCH WILL BE CARRIED OUT ON INFORMATION REQUIREMENTS ANDFLIGHT CREW PERFORMANCE IN RELATION TO FUTURE DATA LINK COMMUNICATIONS (DLC) SYSTEMS. IT IS EXPECTED THAT AVAILABILITY OF CRITICAL INFORMATION IN THE COCKPIT FROM DLC SYSTEMS WILL FACILITATE IMPROVED TRANSPORTATION EFFICIENCY AND SAFETY. HOWEVER, THERE MAY BE SOME PRICE IN TERMS OF CREW WORKLOAD. TASK ANALYSIS AND HUMAN FACTORS INFORMATIO ...

    SBIR Phase I 1991 Department of Transportation
  5. A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires

    SBC: UTD, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  6. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  7. DYNAMIC GPS ATTITUDE DETERMINING SYSTEM FOR MARINE APPLICATIONS

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Transportation
  8. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. ENHANCED GPS FOR TERMINAL AREA NAVIGATION

    SBC: Deering System Design Consulta            Topic: N/A

    THIS SBIR PROPOSAL DEFINES THE SYSTEM REQUIREMENTS FOR A LOWCOST INTEGRATED PRECISION APPROACH, LANDING AND TAXI SYSTEM BASED ON GPS NAVIGATION FOR GENERAL AVIATION USERS. FLIGHT TESTS WILL BE CONDUCTED USING DIFFERENTIAL OR ENHANCED DIFFERENTIAL GPS TECHNIQUES. THE RESULTS OF THESE TESTS WILL HELP DETERMINE THE TECHNICAL FEASIBILITY OF THE GPS-BASED SYSTEM, THE REQUIREMENTS FOR THE GPS RECEIVER, ...

    SBIR Phase I 1991 Department of Transportation
  10. Feasibility Study of an Internet-Based GUI for Highway Capacity Software

    SBC: Viggen Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
US Flag An Official Website of the United States Government