You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
AH-IW ATTACK HELICOPTER COCKPIT WORKLOAD REDUCTION
SBC: DCS CORP. Topic: N/ATHE COMPLEX AVIONICS AND SOPHISTICATED TACTICS NECESSARY TO DELIVERPRECISION GUIDED MUNITIONS AND COUNTER MODERN MILITARY THREATS PLACE A SIGNIFICANT BURDEN ON THE CAPABILITIES OF THE ATTACK HELICOPTER AND THE PHYSICAL AND COGNITIVE CAPACITIES OF THEIR AIRCREW. THESE CONSTRAINTS DICTATE THAT FUTURE AVIONIC DESIGNS AND COCKPIT LAYOUTS ALLEVIATE SOME OF THE AIRCREW-S WORKLOAD DURING INGRESS, WEAPONS ...
SBIR Phase I 1991 Department of DefenseNavy -
Semi-Active Shock and Vibration Isolation for Tactical Aircraft UsingMagnetorheological Fluid Technology
SBC: METRON INCORPORATED Topic: N/AThe objective of this proposal is to demonstrate the feasibility of using Magnetorheological (MR) fluid based dampers for both shock and vibration isolation for the E-2C Hawkeye. Metron has previously developed a prototype system to accomplish this objective in a laboratory demonstration. This proposal represents the minimal level of effort to reproduce this laboratory demonstration. Furthermor ...
SBIR Phase I 1997 Department of DefenseNavy -
IMPROVED PERFORMANCE OF HIGH ENERGY LASER EXHAUST
SBC: Kramer & Assocs Topic: N/ATHE EFFICIENCY OF THE SCRUBBER ON THE HF HIGH ENERGY LASER WILL BE MEASURED UTILIZING FOURIER TRANSFORM INFRARED SPECTROSCOPY (FTIR). CONCENTRATIONS OF HF AND FLOWS WILL BE MEASURED BEFORE AND AFTER THE SCRUBBER, AND RECOMMENDATIONS MADE TO IMPROVE SCRUBBER EFFICIENCY, IF NECESSARY. AMBIENT AIR SAMPLING USING EITHER FTIR OR OTHER WET CHEMICAL METHOD WILL BE PERFORMED TO VALIDATE THE MODEL PREDICTI ...
SBIR Phase I 1990 Department of DefenseArmy -
IMPROVED PERFORMANCE OF HIGH ENERGY LASER EXHAUST
SBC: Kramer & Assocs Topic: N/ATHE EFFICIENCY OF THE SCRUBBER ON THE HF HIGH ENERGY LASER WILL BE MEASURED UTILIZING FOURIER TRANSFORM INFRARED SPECTROSCOPY (FTIR). CONCENTRATIONS OF HF AND FLOWS WILL BE MEASURED BEFORE AND AFTER THE SCRUBBER, AND RECOMMENDATIONS MADE TO IMPROVE SCRUBBER EFFICIENCY, IF NECESSARY. AMBIENT AIR SAMPLING USING EITHER FTIR OR OTHER WET CHEMICAL METHOD WILL BE PERFORMED TO VALIDATE THE MODEL PREDICTI ...
SBIR Phase I 1991 Department of DefenseArmy -
Four Dimensional (4-D)Oceanographic Instrumentation: Ultra Wide Band Synthetic Aperture Radar for Unmanned Aerial Vehicles
SBC: METRATEK, INC. Topic: N/AN/A
SBIR Phase I 1995 Department of DefenseNavy -
AUTOMATED QUALITY DEFICIENCY REPORT UTILIZING COMMERCIALLY AVAILABLE SMART CARD
SBC: Applied Technology Solutions Topic: N/ATHE CURRENT PROCEDURE FOR REPORTING COMMUNICATIONS ELECTRONICS SYSTEM SOFTWARE FAILURE USING PAPER FORMS IS ERROR-PRONE, TIME-CONSUMING AND INEFFICIENT. WHEN NUMEROUS TROUBLE REPORTS ARE ROUTINELY GENERATED, AS IS THE CASE WITH LARGE SYSTEMS OR SYSTEMS DEPLOYED AT MULTIPLE SITES, THE DEFICIENCIES OF PAPER FORMS MAY SEVERLY INHIBIT THE PROBLEM RESOLUTION PROCESS. THE TIMELY CORRECTION OF FIELD FAIL ...
SBIR Phase I 1991 Department of DefenseArmy -
NON-DEVELOPMENTAL ITEM SOFTWARE APPLICATION TO UNDERSEA WARFARE SYSTEMS
SBC: Advanced Communication Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseNavy -
GPS Synchronized Time Code Generator for Airborne PCM Applications
SBC: SVS R&D SYSTEMS, INC. Topic: N/ACoordination of spatially-separated vehicles and test articles during testing and training exercises generates a requirement for closely-matched timing at each location to provide data and event correlation. The use of Global Positioning System (GPS) receivers for timing as well as positioning information greatly increases the accuracy of the data as well as reduces the effort (and cost) of corre ...
SBIR Phase I 1995 Department of DefenseNavy -
AIRCRAFT AND ENGINE PRESERVATION DEVELOPING OF STATE-OF-THE-ART NAVY PROGRAM
SBC: LOGIS-TECH, INC. Topic: N/ARECOGNIZING THAT CORROSION REDUCES PRODUCTIVITY AND EQUIPMENT AVAILABILITY AND ULTIMATELY COSTS $2-4 BILLION ANNUALLY, THE NAVY SEEKS A "PRO-ACTIVE," COMPREHENSIVE AIRCRAFT AND ENGINE PRESERVATION PROGRAM. SIGNIFICANT ADVANCES IN PRESERVATION TECHNOLOGY ARE OCCURRING - NAVY PRESERVATION TECHNIQUES NEED UPGRADING. THIS PROJECT WILL PROVIDE THE BASIS FOR A SOUND, STATE-OF-THE-ART AVIATION AND ENGINE ...
SBIR Phase I 1990 Department of DefenseNavy -
FIBER OPTIC SENSORS FOR IN-SITU PROCESS MEASUREMENTS WITHIN ORGANIC MATRIX COMPOSITE MATERIALS
SBC: Fimod Corp Topic: N/AWE PROPOSE AN IN-SITU OPTICAL FIBER ORGANIC MATRIX CURE/TEMPERATURE MONITOR WHICH ALLOWS ACCURATE DETERMINATION OF LOCALIZED STATE OF CURE DURING TYPICAL COMPOSITE FABRICATION PROCESSES. THE SYSTEM CONSISTS OF A RESIN FIBER WAVEGUIDE ENSOR WHICH MEASURES CHANGES OF REFRACTIVE INDEX AS THE RESIN CURES, AND A NON-SILICA CORE FIBER DISTRIBUTED TEMPERATURE SENSOR WHICH COMPENSATES FOR TEMPERATURE INDU ...
SBIR Phase I 1990 Department of DefenseArmy