You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Computed Tomography Algorithms for Helical Scanned Data

    SBC: ENSCO Inc            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseArmy
  2. Array Beam Imaging for High Resolution Stand-Off Mine Detection

    SBC: Technology & Resource            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseArmy
  3. Staff Training in Information Management for Force XXI

    SBC: COGNITIVE TECHNOLOGIES, INC.            Topic: N/A

    Recent cognitive research indicates that military teams operate effectively in high-stress, information-rich environments when they 1) share mental models of the battlefield situation and the team; 2) critique their situation model to develop clear goals for information retrieval; 3) effectively communicate information needs to others; and 4) anticipate and counteract information overload. We pro ...

    SBIR Phase I 1997 Department of DefenseArmy
  4. Interactions of Training and Decision Support: Measuring the Benefits in Trust, Situation Awareness, and Workload

    SBC: COGNITIVE TECHNOLOGIES, INC.            Topic: N/A

    Inappropriate trust of automation can lead to suboptimal performance, in which the respective capabilities of humans and computers are not effectively exploited. In some cases, over- or under-reliance can lead to catastrophe. The primary objectives of the proposed Phase I work are (1) to develop a systematic general framework for training users of decision aids, with particular attention to the ...

    SBIR Phase I 1997 Department of DefenseArmy
  5. High Resolution Remote Doppler Lidar Wind Sensor

    SBC: COHERENT TECHNOLOGIES, INC.            Topic: N/A

    The overall objective of the proposed program is to develop an eyesafe high-resolution Doppler lidar edge-technique-based sensor capable of 3 m spatial resolution, 0.2 m/sec velocity precision, and adequate temporal resolution to permit remote measurement of low altitude atmospheric disturbances to range of 1-10 km. The objective is to develop a compact, low-weight, low-power, and low-cost sensor ...

    SBIR Phase I 1997 Department of DefenseArmy
  6. EMP AND HPM SUPPRESSION TECHNIQUES

    SBC: Integrated Sciences            Topic: N/A

    Survival of present day microelectronic circuits depends on their protection from self generated and external electromagnetic interference. This proposal is oriented toward the class of interference generally referred to as overvoltage transients. Means for mitigating these transients include gas discharge tubes, and various solid state devices. Each of these has their own advantages in particu ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  7. Low-Frequency, Ultra-Wideband (UWB) Synthetic Aperture Radar (SAR) Antennas Compatible with Unmanned Aerial Vehicles (UAV)

    SBC: Millimeter Wave Technology,            Topic: N/A

    The objective of this basic research is to design and develop a low-frequency, ultra-wide band (UWE) antenna. Such an antenna combined with a pulse-generating radar system would be capable of penetrating and detecting targets through foliage, ice, snow, and even earth. Development of appropriate radar systems is state-of-the-art except for the antenna, which requires a breakthrough in technology ...

    SBIR Phase I 1997 Department of DefenseArmy
  8. A Tough Wear-Resistant Polymer/Ceramic Composite with Hierarchical Structures

    SBC: TDA RESEARCH, INC.            Topic: N/A

    This Small Business Innovation Research Phase I project will develop a tough, strong, inexpensive and highly wear resistant ceramic composite with a "brick and mortar" microstructure. Biological materials such as nacre have high strength, high toughness and surprisingly high wear resistance even though they are composed of relatively soft materials. On the other hand, engineering ceramics achiev ...

    SBIR Phase I 1997 Department of DefenseArmy
  9. Development and Validation of an Exogenous Metabolic Activation System for FETAX

    SBC: STOVER & ASSOC., INC.            Topic: N/A

    Frog Embryo Teratogenesis Assay: Xenopus (FETAX) is a 96-h, whole-embryo bioassay designed to detect potential developmental toxicants. The primary goal of this research is to improve the predictability and increase the overall utility of FETAX as a screen for developmental toxicants that pose a hazard to human health. Since Xenopus laevis embryos lack mixed-fliriction oxidase metabolism (cytoch ...

    SBIR Phase I 1997 Department of DefenseArmy
  10. Systematic Antibody Optimization

    SBC: Systems & Processes Engineering Corporation            Topic: N/A

    Optimization of antibody affinity and specificity is of paramount importance to the military for the development of biological warfare agent receptors and vaccine components. Exhaustive saturation mutagenesis of the complete antigen binding site for such optimization must typically involve the construction and characterization of several hundred mutants. Using conventional mutagenesis, the expen ...

    SBIR Phase I 1997 Department of DefenseArmy
US Flag An Official Website of the United States Government