You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Portable Active Thermographic Coating Inspection System
SBC: Fuchs Consulting Inc Topic: 091FH2This proposal seeks to produce a unique thermographic coating inspection system that is customized for the inspection of bridge coatings. This system uses active thermography where IR sources are used to provide controlled heating to a coating system. The presence of a defect in a coating system will result in differences in heat flow, which can be imaged with an infrared camera. An off-the-she ...
SBIR Phase I 2009 Department of Transportation -
MWM-Array Characterization of Widespread Fatigue Damage Onset
SBC: JENTEK SENSORS, INC. Topic: N/AThis proposal will investigate the potential of an enhanced version of the Meandering Winding Magnetometer (MWM), called the MWM-Array, to characterize and predict remaining life for components experiencing widespread fatigue damage. The MWM has already demonstrated the potential to characterize fatigue damage in metals priod to the formation of cracks, as well as the ability to detect and charac ...
SBIR Phase I 1996 Department of Transportation -
Automated Production of Composite Energy Absorbing Utility Poles
SBC: KaZaK Composites Incorporated Topic: N/AKaZaK Composites, Kaman Sciences and Dr. Malcolm Ray of the University of Iowa propose to investigate the design of energy absorbing utility poles made from composite materials. This team has considerable experience in the multiple technologies needed to successfully complete the proposed program, including design of high performance composite products for automated production and design, analysi ...
SBIR Phase I 1996 Department of Transportation -
Monolithic Fully Integrated Optic Inertial Navigation System
SBC: Optisensors Inc Topic: N/AThe GPS is an affordable and accurate means of guiding military and civilian aircraft. However, at times the GPS signal becomes blocked or degraded due to loss of satellite lock or poor viewing angle. It is necessary to back it up with inertial navigation. However, there is no INS system which is accurate enough and inexpensive enough to do the job. A completely monolithic fully integrated INS ...
SBIR Phase I 1996 Department of Transportation -
Neutron Radiography with Inorganic Scintillation Detectors
SBC: World Physics Technologies, Inc. Topic: N/AWe propose here to evaluate a variety of inorganic scintillators, including sodium iodide and bismuth germanate, for use in energy-sensitive neutron detectors. We will couple these crystals to photomultiplier tubes and measure the prompt response to inelastic neutron reactions with the scintillator atoms. To unfold the incident neutron energy distribution from the resulting signal pulse heights, ...
SBIR Phase I 1996 Department of Transportation -
A Multi-Pedestrian Counting System Using Fusion of Stereo Camera and Laser Scanner
SBC: Migma Systems Inc. Topic: 091FH4Automated vehicle counting technology has been in use for many years, but developments in automated pedestrian counting technology have been limited. Pedestrians are more difficult to detect, track and count, than motor vehicles because their paths are much less constrained. In Phae I, we propose to develop a new system for pedestrian detection, tracking and counting. In this system, both IR LE ...
SBIR Phase I 2009 Department of Transportation -
Development of Breakaway Guy Wires for Utility Poles
SBC: FOSTER-MILLER, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Non-contact Track Gage Measurement System (NC-TGMS)
SBC: DFUZION, INC. Topic: 081FR4One of the causes of derailments occurs when the track gage is no longer compliant with the FRA track safety standards for gage measurments. Ensuring track gage is in compliance with the FRA track safety standards is therefore of paramount importance to the FRA. Currently, the FRA wishes to develop a non-contact track gage measurement system that overcomes the limitations of current systems (unr ...
SBIR Phase I 2009 Department of Transportation -
A New Optical Traffic Monitor
SBC: Science Research Laboratory, Inc Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Water Quality Monitoring Device
SBC: Gky And Associates, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation