You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Computed Tomography Algorithms for Helical Scanned Data

    SBC: ENSCO Inc            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseArmy
  2. Soldier Situational Awareness and Well-being

    SBC: TERI RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseArmy
  3. Economical and Reliable Adaptive Disturbance Cancellation for Lightly Damped Systems

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    Efforts to apply active noise and vibration control commercially, while intensifying, continue to be hampered by the cost of the computers required to implement the active algorithms. Currently, the cost of wide-band control is prohibitive for lightly damped systems such as precision structures or highly reverberant acoustic spaces, even if the system has just one canceling actuator and one error ...

    SBIR Phase I 1997 Department of DefenseAir Force
  4. Phytiremediation of Uranium Contaminated Soils

    SBC: Phytotech, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseArmy
  5. Automatic Feature Combined Track-Detect-Localize Technique

    SBC: DIGITAL SYSTEM RESOURCES, INC.            Topic: N/A

    A progressive system development is proposed which uses Bayesian methodology for combined detect, track, localize, and classify. The core paradigm focuses on detection followed by various estimation schemes to extract information on contact type, track, and location from the detector. A rapid prototype development using the Generic Multipurpose Processor (GMP) will provide optimal detection ...

    SBIR Phase I 1997 Department of DefenseNavy
  6. Computer Enhanced Eddy Current Detection of Hidden Substructure Edges and Holes

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  7. Scalable Secure Broadcasting Mechanisms for Satellite Networks

    SBC: Artery Communication            Topic: N/A

    Secure broadcasting mechanisms play an important role in satellite-based communications networks. In this Phase I SBIR project, Artery Communication Technology Inc. proposes a scalable secure data broadcasting architecture that is both bandwidth efficient and as secure as state of the art public key cryptosystems. The major emphasis of this project is to analyze the detailed performance behavior ...

    SBIR Phase I 1997 Department of DefenseAir Force
  8. HF Extension to Modern Network

    SBC: CENTER FOR REMOTE SENSING, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  9. Ultra-Textured Active polymer (UTAP) Composite for High-Performance Intelligent Acoustic Transducers

    SBC: Ceramare Corporation            Topic: N/A

    This Small Business Innovative Research Phase I project seeks to combine the enhanced piezoelectric properties of single crystal perovskite ferroelectrics, recently discovered at Pennsylvania State University, with the electrostrictive properties of polyurethane to make a new class of "smart" materials for acoustic transducers. A tape casting process is used to form composite sheets compromising ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  10. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government