You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. EDDY CURRENT NONDESTRUCTIVE EVALUATION OF LASER GLAZED METALLIC SURFACES

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Energy
  2. Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  3. A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles

    SBC: Commercial Electronics, Inc.            Topic: N/A

    86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...

    SBIR Phase I 1997 Department of Energy
  4. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. A SYNTHETIC BEAM SONAR SYSTEM FOR MOBILE ROBOTS AND TELEOPERATORS

    SBC: Cybermation Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  6. DEVELOPMENT OF MODULAR, HIGH PERFORMANCE FLUIDIC COMPONENTS FOR VENTILATION CONTROL IN NUCLEAR FACILITIES

    SBC: DEFENSE RESEARCH TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  7. DESIGN OF A HIGH-SPEED INTELLIGENT BUFFER/MEMORY FOR THE FASTBUS

    SBC: Dvp, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Energy
  8. LNG Storage and Delivery System Analysis

    SBC: Directed Technologies, Inc.            Topic: N/A

    87 LNG Storage and Delivery System Analysis--Directed Technologies, Inc., 4001 North Fairfax Drive, Suite 775, Arlington, VA 22203-1614; (703) 243-3383 Mr. Brian D. James, Principal Investigator Mr. Ira F. Kuhn, Jr., Business Official DOE Grant No. DE-FG02-97ER82357 Amount: $75,000 To reduce foreign fuel dependence and improve the Nation¿s air quality, new high-efficiency, direct-injection d ...

    SBIR Phase I 1997 Department of Energy
  9. ON-LINE PLANT ANALYZER UTILIZATION IN CONTROL ROOM FOR SURVEILLANCE OF PLANT SAFETY

    SBC: Dynatrek Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Nuclear Regulatory Commission
  10. HUMAN PRESENCE DETECTION IN VEHICLES

    SBC: ENSCO Inc            Topic: N/A

    AN EXISTING SYSTEM HAS DEMONSTRATED, IN QUIET CONDITIONS, VERY RELIABLE DETECTION OF HUMANS HIDDEN IN VEHICLES. SEISMIC VIBRATIONS ARE THE MAJOR, UNAVOIDABLE LIMITATIONS. MEASUREMENT OF THE SEISMIC VIBRATIONS AND COHERENT ANALYSES WILL BE UTILIZED TO COMPUTE AND SUBTRACT THE EFFECT OF THE SEISMIC INTERFERENCE ON THE VEHICLE MOTION. THE PHASE I EFFORT WILL IMPROVE THE RELIABILITY, INCREASE THE S ...

    SBIR Phase I 1994 Department of Energy
US Flag An Official Website of the United States Government