You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
REAL-TIME COLLECTION OF OPERATIONAL DATA TO SUPPORT RISK-BASED OPERATION REGULATION AND INSPECTIONS AT NUCLEAR POWER PLANTS
SBC: Accident Prevention Group Topic: N/ACOMPUTERIZED DATA COLLECTION DEVICES EXIST AND ARE BEING USED IN VARIOUS APPLICATIONS AT SOME NPPS FOR SYSTEMS AND EQUIPMENT NOT INSTRUMENTED IN THE CONTROL ROOM. HOWEVER, CURRENT APPLICATIONS IN THE NUCLEAR POWER INDUSTRY ARE RATHER SPORADIC AND NOT EXPLOITING THE FULL POTENTIAL OF THE TECHNOLOGY. FOR EXAMPLE, SEVERAL DIFFERENT NPPS USE SUCH SYSTEMS FOR SINGLE- PURPOSES SUCH AS TRENDS IN EQUIPMEN ...
SBIR Phase I 1993 Nuclear Regulatory Commission -
ADVANCED METHODS FOR MODELING TEAM EFFECTS ON CONTROL-ROOM OPERATOR PERFORMANCE IN REAL-TIME
SBC: ASCA, INC. Topic: N/ATHIS RESEARCH SEEKS THE DEVELOPMENT AND DEMONSTRATION OF A MODEL THAT REPRESENTS THE GROUP DECISION-MAKING PROCESSES TAKING PLACE INSIDE THE CONTROL ROOM OF A NUCLEAR POWER PLANT UNDER BOTH NORMAL AND ABNORMAL OPERATING CONDITIONS. COGNITIVE DECISIONS, TEAM EFFECTS, AND DYNAMIC FEATURES ARE AMONG THE MAJOR ISSUES THAT WILL BE ADDRESSED IN THE PROJECT. THE BASIC TOOL TO BE USED IS THE INFLUENCE DIA ...
SBIR Phase I 1993 Nuclear Regulatory Commission -
CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING
SBC: Atkinson-noland Assoc. Inc. Topic: N/AN/A
SBIR Phase I 1993 Nuclear Regulatory Commission