You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. EMP AND HPM SUPPRESSION TECHNIQUES

    SBC: Integrated Sciences            Topic: N/A

    Survival of present day microelectronic circuits depends on their protection from self generated and external electromagnetic interference. This proposal is oriented toward the class of interference generally referred to as overvoltage transients. Means for mitigating these transients include gas discharge tubes, and various solid state devices. Each of these has their own advantages in particu ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  2. Neutron Radiography with Inorganic Scintillation Detectors

    SBC: World Physics Technologies, Inc.            Topic: N/A

    We propose here to evaluate a variety of inorganic scintillators, including sodium iodide and bismuth germanate, for use in energy-sensitive neutron detectors. We will couple these crystals to photomultiplier tubes and measure the prompt response to inelastic neutron reactions with the scintillator atoms. To unfold the incident neutron energy distribution from the resulting signal pulse heights, ...

    SBIR Phase I 1996 Department of Transportation
  3. MONOLITHIC, LOW-COST TRANSIENT RECORDER WITH AUTOMATIC GAIN RANGING (AGR)

    SBC: Q-DOT, INC.            Topic: N/A

    Q-DOT proposes to develop an innovative, monolithic recorder for acquiring pressure v. Time history of the event. The signal range of 1mV to 1 V p-p is spanned with automatic gain ranging (AGR) which provide one of eight base-2 gains to optimize the 9-bit analog-to-digital converter (ADC). The AGR and ADC together span a 16-bit range, easing setup. Performance is attained without elaborate cali ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  4. Water Quality Monitoring Device

    SBC: Gky And Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  5. Microwave NDT of Cracks in Structural Metals

    SBC: Raymond & Lae Engineering,            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  6. Ionic Self-Assembled Organic/ Inorganic Nonparticle Coatings and Composites

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  7. A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires

    SBC: UTD, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  8. Feasibility Study of an Internet-Based GUI for Highway Capacity Software

    SBC: Viggen Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  9. Digital Waveform-Based System for Acoustic Emission Measurement for Nondestructive Testing of Structural Steel

    SBC: Digital Wave Corp.            Topic: N/A

    Digital Wave Corporation proposed to develop a novel nondestructive testing (NDT) system for high speed acquisition and analysis of wide band acoustic emission (AE) waveforms. The system will provide the capability to detect, identify and locate crack growth in loaded steel structures. This system will incorporate the new high fidelity sensor developed by the Federal Highway Administration and a ...

    SBIR Phase I 1996 Department of Transportation
  10. Distributed Interactive Simulation of Nuclear Weapons Effects

    SBC: Micro Analysis & Design Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government