You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Abductive Electronics Prognostic Tool (ADEPT)

    SBC: ABTECH CORPORATION            Topic: N/A

    AbTech Corporation proposes to apply its unique Statistical Network ModelingTM technology to develop a non contact prognostic assessment tool that 1) acquires, processes, and analyzes electronic radiated signal data, 2) learns the expected characteristics and patterns of specific radiated signals measured from microelectronic semiconductor devices using AbTech's statistical network modeling techno ...

    SBIR Phase I 1997 Department of DefenseAir Force
  2. A Beginning Sign Language VideoCourse for Hearing Adult Learners

    SBC: The Masters Group            Topic: N/A

    This Phase I project will consist of a fesibility study in preparation for Phase II project in which a complete 20-hour sign language videocourse will be produced reflecting the entry level skills, learning styles, learning preferences, and sign-processing strategies of hearing adult beginning learners. The primary hearing populations for this instruction are (a) current and prospective teachers ...

    SBIR Phase II 1997 Department of Education
  3. A Beginning Sign Language VideoCourse for Hearing Adult Learners

    SBC: The Masters Group            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Education
  4. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    41299 November 19, 1996 FM Technologies, Inc. In the Relativistic Klystron Two-Beam Accelerator, which is currently under development, power from a low-energy, high-current, bunched beam is converted to micro-waves via the klystron mechanism and used to provide power for a high-energy linac, specifically a future Next Linear Collider upgrade to l.0 TeV. ...

    SBIR Phase II 1997 Department of Energy
  5. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  6. A Combined Micro-Mechanics, Fracture Mechanics, And Statistical Approach For Life Prediction Of Ceramic Matrix And Metal Matrix Composites

    SBC: Tao Of Systems Integration Inc            Topic: N/A

    N/A

    SBIR Phase II 1996 National Aeronautics and Space Administration
  7. A COMPACT ROBOTIC COMMAND CENTER PHASE II: IMPLEMENTING A HARDENED COMPACT UNIT

    SBC: Cybernet Systems Corporation            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseArmy
  8. A Compact X-Ray Laser

    SBC: Tetra Corporation            Topic: N/A

    The advanced technology described in this proposal promises to increase the performance of laboratory and, specifically, tabletop x-ray lasers by up to an order of magnitude. Such gains in performance coupled with compact technology will lead to the introduction of the world s first table-top, commercial x-ray laser. Tetra proposes to develop an advanced driver for the laboratory laser based upo ...

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
  9. A Computational Model of Human Perception- Application to Target Detection

    SBC: M-VISION INC            Topic: N/A

    M-Vision Inc., along with the University of Michigan and Michigan State University, proposes to develop a new and novel solution to the problem of target detection and discrimination in a complex scene. This solution is obtained by innovatively combining Gabor wavelets and scale space inference. The result is a computational model of human perception that resembles the human visual system in its ...

    SBIR Phase I 1997 Department of DefenseArmy
  10. A Configurable Object-Oriented Expert System to Embody Cultural (Awareness) Models for Simulation and Semi-Autonomous Forces

    SBC: AURORA SIMULATION, INC.            Topic: N/A

    One of the biggest problems faced by both military and non-military personnel in planning and conducting Operations Other Than War (OOTW) and Law Enforcement (LE) is a lack of cultural awareness. A lack of cultural awareness in OOTW causes misplanning and misinterpretation in the areas of economics, politics, religion, and historical events. The objective of the proposed work is to produce a des ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government