You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Abductive Electronics Prognostic Tool (ADEPT)

    SBC: ABTECH CORPORATION            Topic: N/A

    AbTech Corporation proposes to apply its unique Statistical Network ModelingTM technology to develop a non contact prognostic assessment tool that 1) acquires, processes, and analyzes electronic radiated signal data, 2) learns the expected characteristics and patterns of specific radiated signals measured from microelectronic semiconductor devices using AbTech's statistical network modeling techno ...

    SBIR Phase I 1997 Department of DefenseAir Force
  2. ABDUCTIVE NETWORKS FOR COMPLEX AERONAUTICAL SYSTEMS DEVELOPMENT

    SBC: ABTECH CORPORATION            Topic: N/A

    INNOVATIVE ARTIFICIAL INTELLIGENCE TECHNIQUES HAVE THE POTENTIAL TO SOLVE MANY COMPLEX AIR FORCE PROBLEMS. ADVANCES IN COMPUTING SPEED AND EXISTING SOFTWARE TECHNOLOGY ALONE ARE UNLIKELY TO RESULT IN REAL-TIME AERONAUTICAL SYSTEMS CAPABLE OF MEETING THE COMPLEX REQUIREMENTS OF THE AIR FORCE MISSION. RATHER, AN ALTERNATIVE METHODOLOGY SUCH AS ABDUCTIVE TECHNOLOGY, A NEW TECHNOLOGY PRESENTED IN THIS ...

    SBIR Phase I 1990 Department of DefenseAir Force
  3. ABDUCTIVE NETWORKS FOR SPACE SURVEILLANCE AND CLASSIFICATION

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
  4. A Beginning Sign Language VideoCourse for Hearing Adult Learners

    SBC: The Masters Group            Topic: N/A

    This Phase I project will consist of a fesibility study in preparation for Phase II project in which a complete 20-hour sign language videocourse will be produced reflecting the entry level skills, learning styles, learning preferences, and sign-processing strategies of hearing adult beginning learners. The primary hearing populations for this instruction are (a) current and prospective teachers ...

    SBIR Phase II 1997 Department of Education
  5. A Beginning Sign Language VideoCourse for Hearing Adult Learners

    SBC: The Masters Group            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Education
  6. ABR with Low Bandwidth ATM

    SBC: SCIENTIFIC RESEARCH CORP.            Topic: N/A

    This proposal has three main efforts:1. Extension of the ATM Forum ABR protocol to allocate bandwidth according to quality of service (QoS) and priority level of the individual connection. This project will utilize the informational bits provided by the fields to support QoS and priority level acknowledgment.2. Design of an ATM application that utilizes the ABR service via an application programme ...

    SBIR Phase I 1997 Department of DefenseAir Force
  7. ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    IN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...

    SBIR Phase I 1990 Department of DefenseArmy
  8. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    41299 November 19, 1996 FM Technologies, Inc. In the Relativistic Klystron Two-Beam Accelerator, which is currently under development, power from a low-energy, high-current, bunched beam is converted to micro-waves via the klystron mechanism and used to provide power for a high-energy linac, specifically a future Next Linear Collider upgrade to l.0 TeV. ...

    SBIR Phase II 1997 Department of Energy
  9. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  10. Accurate Automation Corporation Fuzzy Logic/ Neural Network Processor

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    In this project we will adapt our programmable neural network processor (NNP) into a Fuzzy/neural network processor (FNNP). Already having the commercially successful NNP, we begin this program with more than half the work completed. we will define and evaluate NNP architectural modifications to optimize both data flow and data processing for both fuzzy logic and neural network- Operations- we w ...

    SBIR Phase I 1996 Department of DefenseNavy
US Flag An Official Website of the United States Government