You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ADAPTIVE RESOURCE ALLOCATION FOR ADVACED ELINT\ESM SYSTEMS
SBC: Greenbriar Systems Inc. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
Advanced Armor Vehicle Design
SBC: Physics Mathematics & Topic: N/AThis project applies a combination of Artificial Neural Networks (ANN), Genetic Algorithms (GA), and CAD software to the problem of optimum armor design. Previous work for TACOM has established the efficacy of ANN/GA as applied to the problem of 1-D armor design. This new work will extend the concept to full 3-D vehicle geometries (CAD models). The CAD part of the code will handle the 3D data d ...
SBIR Phase I 1997 Department of DefenseArmy -
An Advanced Integrated Electric Wheel Motor and Hydraulic Suspension System for High-Mobility Scout Ground Vehicle
SBC: NEW GENERATION MOTORS CORP. Topic: N/AMilitary scout vehicles and commercial sports utility vehicles share the common need for advanced suspension/drive systems that offer robustness over widely varying terrain. The ultimate system for handling, ride isolation, and stability control would incorporate high efficiency electric motors independently driving the four wheels, with one on-board high-level computer for controlling the active ...
SBIR Phase I 1997 Department of DefenseArmy -
A Novel Non-Lethal Effects Device
SBC: Adroit Systems, Inc. Topic: N/AThe topic presented in this proposal has direct application to the development of non-lethal devices capable of temporarily incapacitating personnel, controlling crowds, immobilizing small vehicles, and other applications where a controlled amount of acoustic c energy needs to be delivered a a distance. The proposed effort would determine the characteristic acoustic waveforms and amplitudes gener ...
SBIR Phase II 1997 Department of DefenseArmy -
AN ULTRA-HIGH SPEED RESIDUE NUMBER PROCESSOR FOR SAFT INSPECTION SYSTEM IMAGE ENHANCEMENT
SBC: Sigma Research Corp Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
A RSTA Algorithmic Framework with Uncertainty Management
SBC: Cyber Solutions, Inc. Topic: N/AOne of the most challenging information management problems related to the Reconnaissance, Surveillance and Target Acquisition (RSTA) missions is the real-time spatio-temporal fusion of target-specific cues from a netwotk of multiple sensor platforms. A robust algorithmic framework is necessary to involve the multiple agents together and achieve the optimal trade-off between low false alarm rate ...
SBIR Phase I 1997 Department of DefenseArmy -
AUTOMATED AMMUNITION LOADING OF COMBAT VEHICLES
SBC: Ren Corp Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
BROADBAND TRANSMITTING ANTENNA
SBC: ASTRON WIRELESS TECHNOLIGIES, INC. Topic: N/AN/A
SBIR Phase I 1983 Department of DefenseArmy -
COMBINING LASER MEASUREMENTS WITH BACKWARD WAVE TECHNIQUES FOR EVALUATION OF UNDERGROUND OPENINGS IN OIL SHALE
SBC: Sigma Research Corp Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
Compact Mid-Infrared Laser
SBC: Aculight Corporation Topic: N/ASignificant deficiencies exist in the laser source technology for IRCM, specifically in the limited pulse rep-rate capability, limited average power output and capability to be transitioned to military environments. We propose a novel tandem OPO concept that uses two noncritical phasematched OPO's in KTA and AgGaSe(2) to generate the desired three output wavelength bands simultaneously. This con ...
SBIR Phase II 1997 Department of DefenseArmy