You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    THIS RESEARCH PROPOSAL DEALS WITH THE DEVELOPMENT OF A GAMMARAY DOSIMETER THAT IS BASED ON A SOLID STATE DETECTOR AND A MICROPROCERSSOR AND WILL DISPLAY THE DOSE AND DOSE RATE OF THE SKIN, AT A GIVEN DEPTH OF THE BODY OR THE BODY-AVERAGED DOSE, BY MEASURING THE SPECTRUM OF A RADIATION FIELD AND CALCULATING THE TISSUE EQAUIVALENT DOSE OF INTEREST. THE DETECTOR IS A PROPRIETARY DESIGN FEATURES OF TH ...

    SBIR Phase II 1991 Nuclear Regulatory Commission
  2. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  3. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  4. Acoustic and Magnetic Signature Reduction for Outboard Engines Using Metal Matrix Composites

    SBC: METAL MATRIX CAST COMPOSITES, LLC (DBA M            Topic: N/A

    Metal matrix composites (MMCs) are the proposed replacement materials for the ferromagnetic parts that exist in an outboard engine. MMCs have specific stiffness properties 2 to 4 times that of aluminum alloys, steel, and titanium, while having equal or greater specific strength. The resulting parts are extremely light weight yet robust enough to handle high strength applications typically reserv ...

    SBIR Phase II 1997 Department of DefenseSpecial Operations Command
  5. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  6. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    TWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.

    SBIR Phase II 1990 Nuclear Regulatory Commission
  7. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  8. HIGH SENSITIVITY LANDFILL MONITOR

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1991 Nuclear Regulatory Commission
  9. LONG RANGE RADIOACTIVE PLUME TRANSPORT SIMULATION MODEL/CODE

    SBC: Sigma Research Corp            Topic: N/A

    THE OBJECTIVE OF THE PHASE I RESEARCH IS TO DETERMINE THE TECHNICAL FEASIBILITY OF THE DEVELOPMENT OF A LONG RANGE RADIOACTIVE PLUME TRANSPORT MODEL/CODE FOR THE NRC. THIS CODE WOULD BE USED TO SIMULATE THE MOVEMENT, DISPERSION, DECAY, AND DEPOSITION OF RADIONUCLIDES RELEASED FROM SEVERE NUCLEAR REACTOR ACCIDENTS, SUCH AS THE CHERNOBYL ACCIDENT. IT IS DESIRED THAT ALL RELEVANT PHYSICAL AND CHEMICA ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  10. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government