You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. LOW ELEVATION SENSITIVE GPS ANTENNA WITH MULTIPATH SUPPRESSION

    SBC: Adroit Systems, Inc.            Topic: N/A

    ADROIT SYSTEMS, INC. PROPOSES TO DESIGN A NEW ANTENNA FOR A DIFFERENTIAL GPS (DGPS) BASE RECEIVER IN PHASE I, AND TO PROTOTYPE AND TEST THIS ANTENNA IN PHASE II. THIS NEW ANTENNA WILL INCORPORATE OPTIMUM LOW ELEVATION GAIN AND MULTIPATH SUPPRESSION TO ALLOW THE TRACKING OF SATELLITES AT ELEVATIONS FROM THE HORIZON TO FIVE DEGREES. AT ALL ELEVATIONS, THE ANTENNA WILL MINIMIZE ERRORS DUE TO MULTIPAT ...

    SBIR Phase I 1991 Department of Transportation
  2. DYNAMIC GPS ATTITUDE DETERMINING SYSTEM FOR MARINE APPLICATIONS

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Transportation
  3. DEVELOPMENT OF ANGULAR ACCELEROMETER

    SBC: A-TECH CORPORATION            Topic: N/A

    A RESEARCH EFFORT COMPLETED RECENTLY FOR THE AIR FORCE IDENTIFIED NEW TECHNOLOGIES FOR ANGULAR MOTION MEASUREMENT. TWO CONCEPTS WERE FOUND WHICH APPEAR TO OFFER POTENTIAL FOR AN EXCELLENT COMBINATION OF SMALL SIZE, WIDE DYNAMIC RANGE, WIDE BANDWIDTH AND EASE OF FABRICATION AND UTILIZATION. ONE DEVICE, CALLED A FLUID-FILLED BENDER BEAM, USES PIEZOCERAMICELEMENTS TO PRODUCE A SIGNAL PROPORTIONAL TO ...

    SBIR Phase II 1987 Department of Transportation
  4. VERIFICATION OF STEEL PLACEMENT IN PORTLAND CEMENT CONCRETE USING SHORT-PULSE RADAR TECHNIQUES

    SBC: Bomar Associates Inc.            Topic: N/A

    THERE IS A NEED FOR A RAPID, NON-DESTRUCTIVE METHOD TO TEST FOR PROPER STEEL PLACEMENT IN PORTLAND CEMENT PAVEMENTS. ISTHE GOAL OF THIS PROPOSED PROGRAM TO DEMONSTRATE THE FEASIBILITY OF USING SHORT-PULSE, GROUND-PENETRATING RADAR AS A MEANS OF RAPID STEEL LOCATION IN CONCRETE PAVEMENT. A GENERAL BACKGROUND IN GROUND-PENETRATING RADAR THEORY IS PRESENTED. LABORATORY AND FIELD MEASUREMENTS USING A ...

    SBIR Phase II 1990 Department of Transportation
  5. VERIFICATION OF STEEL PLACEMENT IN PORTLAND CEMENT CONCRETE USING SHORT-PULSE RADAR TECHNIQUES

    SBC: Bomar Associates Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of Transportation
  6. AIRBORNE DATA LINK COCKPIT MANAGEMENT AND DISPLAY

    SBC: CARLOW INTERNATIONAL, INC.            Topic: N/A

    RESEARCH WILL BE CARRIED OUT ON INFORMATION REQUIREMENTS ANDFLIGHT CREW PERFORMANCE IN RELATION TO FUTURE DATA LINK COMMUNICATIONS (DLC) SYSTEMS. IT IS EXPECTED THAT AVAILABILITY OF CRITICAL INFORMATION IN THE COCKPIT FROM DLC SYSTEMS WILL FACILITATE IMPROVED TRANSPORTATION EFFICIENCY AND SAFETY. HOWEVER, THERE MAY BE SOME PRICE IN TERMS OF CREW WORKLOAD. TASK ANALYSIS AND HUMAN FACTORS INFORMATIO ...

    SBIR Phase I 1991 Department of Transportation
  7. SIMPLIFIED AUTO CRASH MEASURING USING A PORTABLE INTEGRATED LASER RADAR/CAMCORDER

    SBC: Coleman Research Corp.            Topic: N/A

    DIGITAL SIGNAL CORPORATION PROPOSES TO REPLACE THE CURRENT VEHICLE CRUSH MEASUREMENT SYSTEM OF HIGHLY TRAINED INVESTIGATORS USING TIME CONSUMING METHODS WITH A PORTABLE, RUGGED, EASY TO USE LASER RADAR/CAMCORDER SYSTEM. THE BENEFITS RANGE FROM EASY TO REPRODUCE AND CORROBORABLE RESULTS TO AN INCREASE IN PRODUCTIVITY POSSIBLE WITH A TRIPOD MOUNTED SYSTEM WHICH SETS UP AND TAKES DATA WITHIN MINUTES. ...

    SBIR Phase I 1991 Department of Transportation
  8. INFLATABLE PADDING FOR HARD SURFACES IN VEHICLE INTERIORS

    SBC: Concept Analysis Corp            Topic: N/A

    OCCUPANT INJURY CAN BE SIGNIFICANTLY REDUCED BY THE INCORPORATION OF PADDING OF HARD SURFACES IN VEHICLE INTERIORS. SEVERAL INTERIOR HARD SURFACES SUCH AS ROOF HEADER, A-PILLAR, AND B-PILLAR ARE DIFFICULT TO PAD DUE TO LIMITED SPACE. WAT IS NEEDED IS AN INFLATABLE PLASTIC BI-LAYER THAT COULD BE ATTACHED TO HARD SURFACES AND GIVE ACCEPTABLE WEAR AND APPEARANCE WHEN UNINFLATED, YET BE INFLATABLE DUR ...

    SBIR Phase I 1990 Department of Transportation
  9. IMPROVEMENT IN THE GRAPHITE REFERENCE CELL FOR REINFORCED CONCRETE

    SBC: Giner, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Transportation
  10. Improved Source Location Using Sensor-Arrays

    SBC: Cyltek, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
US Flag An Official Website of the United States Government