You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Water Quality Monitoring Device
SBC: Gky And Associates, Inc. Topic: N/AThe research is to develop a sheet flow sampler to collect highway washoff and to operate in a highway roadside environment. The proposed sampler is expendable, simple, and cost effective. It will collect a predetermined depth of runoff (most commonly the first 1/2 inch of "first flush"), store it, and be removed and replaced by maintenance workers following rain events. The sampler will be its ...
SBIR Phase II 1997 Department of Transportation -
Feasibility Study of an Internet-Based GUI for Highway Capacity Software
SBC: Viggen Corp.on Topic: N/AIn this proposal, the Viggen Project Team presents an elegant approach to developing a truly portable Graphical User Interface (GUI) for the Highway Capacity Software (HCS). Our approach is based on the emerging Internet-driven computing technology and will be totally platform-independent. The prototype will be developed using a programming language called Java and users will be able to execute ...
SBIR Phase II 1997 Department of Transportation -
VERIFICATION OF STEEL PLACEMENT IN PORTLAND CEMENT CONCRETE USING SHORT-PULSE RADAR TECHNIQUES
SBC: Bomar Associates Inc. Topic: N/ATHERE IS A NEED FOR A RAPID, NON-DESTRUCTIVE METHOD TO TEST FOR PROPER STEEL PLACEMENT IN PORTLAND CEMENT PAVEMENTS. ISTHE GOAL OF THIS PROPOSED PROGRAM TO DEMONSTRATE THE FEASIBILITY OF USING SHORT-PULSE, GROUND-PENETRATING RADAR AS A MEANS OF RAPID STEEL LOCATION IN CONCRETE PAVEMENT. A GENERAL BACKGROUND IN GROUND-PENETRATING RADAR THEORY IS PRESENTED. LABORATORY AND FIELD MEASUREMENTS USING A ...
SBIR Phase II 1990 Department of Transportation -
A Diode Laser Multigas Analyzer for Advanced Detection of Fires
SBC: SOUTHWEST SCIENCES INC Topic: N/ASouthwest Sciences will develop a novel fire detection technology based on optical spectroscopy, using diode lasers and fiber optics. Rapid, quantitative detection of part per million concentrations (or better) of multiple gases, including carbon monoxide, carbon dioxide, hydrogen cyanide, hydrogen chloride, and a fiber optical distribution network permits one laser to be used for at least 800 di ...
SBIR Phase II 1997 Department of Commerce -
TOPOLOGICAL DATA MODELS FOR OBJECT-ORIENTED EXPERT SYSTEMS
SBC: Dba Systems, Inc. Topic: N/ARECENT DEVELOPMENTS EMPLOYING KNOWLEDGE BASED EXPERT SYSTEMSWORKING WITH OBJECT-ORIENTED DATA MODELS HAVE DEMONSTRATED THE FEASIBILITY OF AUTOMATING THE CARTOGRAPHIC MAPPING AND CHART PRODUCTION CYCLE. AREAS WHERE CHART PRODUCTION EXPERTSYSTEMS ARE MOST BENEFICIAL ARE: AUTOMATED PLACEMENT OF FEATURE NAMES, MAP GENERALIZATION AT CHANGE OF SCALE, DETECTION AND RESOLUTION OF SYMBOL PLACEMENT CONFLICT ...
SBIR Phase II 1993 Department of Commerce -
IMPROVEMENT IN THE GRAPHITE REFERENCE CELL FOR REINFORCED CONCRETE
SBC: GINER INC Topic: N/AFOR CATHODIC PROTECTION SYSTEMS TO BE SUCCESSFUL IN MITIGATING CORROSION WITHOUT CAUSING HYDROGEN EMBRITTLEMENT OF PRESTRESSING STEEL, THE AMOUNT OF POLARIZATION OF THE EMBEDDED STEEL MUST BE VERY ACCURATELY CONTROLLED. PRESENTLY AVAILABLE EMBEDDED REFERENCE ELECTRODES DO NOT HAVE THE LONG TERM STABILITY OR RELIABILITY RE@UIRED TO MONITOR AND CONTROL THE AMOUNT OF POLARIZATION WITH THE ACCURACY RE ...
SBIR Phase II 1993 Department of Transportation -
DEVELOPMENT OF A CONTAMINATION MONITOR USING VISUAL IDENTIFICATION
SBC: Shonka Research Associates Topic: N/ATHIS PROJECT WILL RESEARCH AND DEVELOP A FLOOR MONITOR FOR QUICK DETERMINATION OF RADIOACTIVE CONTAMINATION. THE MONITOR WILL UTILIZE A NEW PORTABLE TECHNOLOGY (INCLUDING SUPPORT ELECTRONICS). IT WILL HAVE THE CAPABILITY TO MEASURE BETA CONTAMINATION BELOW 5000 DPM/100 CM SQUARED WHEN AVERAGED OVER ONE SQUARE METER AND COVER AN AREA AS LARGE AS SEVERAL SQUARE FEET PER SECOND. IT WILL ALSO BE CAPAB ...
SBIR Phase II 1993 Nuclear Regulatory Commission -
DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION
SBC: Shonka Research Associates Topic: N/ATWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.
SBIR Phase II 1990 Nuclear Regulatory Commission -
Ionic Self-Assembled Organic/ Inorganic Nonparticle Coatings and Composites
SBC: LUNA INNOVATIONS INCORPORATED Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires
SBC: UTD, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation