You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A BOREHOLE TUBEWAVE DAMPER PROBE FOR HIGH RESOLUTION SEISMICAPPLICATIONS

    SBC: High Resolution Seismics Inc            Topic: N/A

    HIGH RESOLUTION BOREHOLE-TO-BOREHOLE SEISMIC TOMOGRAPHY CAN PROVIDE MUCH OF THE INFORMATION NEEDED TO IDENTIFY SUBTLE OIL RESERVOIR HETEROGENEITIES. TO DATE, MUCH OF THE HIGH RESOLUTION CROSS-WELL RESEARCH HAS INVOLVED THE USE OF FLUID-COUPLED PIEZOELECTRIC SEISMIC SOURCES. HOWEVER, IN PRACTICAL COMMERCIAL APPLICATIONS OF FLUID-COUPLED SOURCES, SOME CONSIDERATION MUST BE GIVEN TO DEPLOYING THE SOU ...

    SBIR Phase I 1991 Department of Energy
  2. A BOREHOLE WALL-LOCKED PIEZOELECTRIC SOURCE FOR HIGH RESOLUTION SEISMIC APPLICATIONS

    SBC: High Resolution Seismics Inc            Topic: N/A

    HIGH RESOLUTION BOREHOLE-TO-BOREHOLE SEISMIC TOMOGRAPHY CAN PROVIDE MUCH OF THE INFORMATION NEEDED TO IDENTIFY SUBTLE RESERVOIR HETEROGENEITIES THUS ALLOWING STRATEGIES PLACEMENTOF PRODUCTION WELLS. HIGH RESOLUTION SEISMIC TECHNIQUES ARE IDEALLY SUITED TO HARD ROCK APPLICATIONS WHERE FORMATIONVELOCITIES EXCEED 10,000 FEET PER SECOND. HOWEVER, TO DATE,THE ACQUISITION OF HIGH FREQUENCY TOMOGRAPHIC D ...

    SBIR Phase I 1991 Department of Energy
  3. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    41299 November 19, 1996 FM Technologies, Inc. In the Relativistic Klystron Two-Beam Accelerator, which is currently under development, power from a low-energy, high-current, bunched beam is converted to micro-waves via the klystron mechanism and used to provide power for a high-energy linac, specifically a future Next Linear Collider upgrade to l.0 TeV. ...

    SBIR Phase II 1997 Department of Energy
  4. Active Shaping of Terawatt Pulses

    SBC: CLARK-MXR, INC.            Topic: N/A

    147 Active Shaping of Terawatt Pulses--Clark-MXR, Inc., P.O. Box 339, Dexter, MI 48130-0339; (313) 426-6265 Dr. Mark Dugan, Principal Investigator Dr. Philippe Bado, Business Official DOE Grant No. DE-FG02-97ER82352 Amount: $74,871 Advanced accelerators for high energy physics research based on high intensity lasers may be significantly less expensive than traditional designs. Consequently t ...

    SBIR Phase I 1997 Department of Energy
  5. A DOWNHOLE STEAM QUALITY TOOL

    SBC: A J Mulac            Topic: N/A

    ENHANCED OIL RECOVERY (EOR) BY STEAM INJECTION IS IN WIDESPREAD USE. BETTER DIAGNOSTIC METHODS ARE NEEDED TO IMPROVE THE EFFICIENCY OF THIS EXISTING TECHNOLOGY AND TO DEVELOP NEW TECHNOLOGY. THIS PROJECT CONSISTS OF A DESIGN AND DEVELOPMENT STUDY OF KEY COMPONENTS REQUIRED FOR A DOWNHOLE STEAM QUALITY MEASUREMENT TECHNIQUE. THE MEASUREMENT METHOD, WHICH IS ONE OF THE MOST FREQUENTLY CITED NEEDS, I ...

    SBIR Phase I 1991 Department of Energy
  6. A FEASIBILITY STUDY FOR A 5-MW, 300-GHZ QUASI-OPTICAL GYROTRON

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Energy
  7. A FEASIBILITY STUDY FOR A SEISMIC EARLY WARNING SYSTEM FOR NUCLEAR POWER PLANT SHUTDOWN

    SBC: ENSCO Inc            Topic: N/A

    A FEASIBILITY STUDY WILL BE CONDUCTED OF A SEISMIC SCRAM-PROCESSING SYSTEM IN WHICH P WAVES FROM LARGE EARTHQUAKES ARE DETECTED AND ANALYZED IN TIME TO INITIATE A NUCLEAR POWER PLANT CORE SHUTDOWN BEFORE THE ARRIVAL OF LARGE, DAMAGING SHEAR WAVE PHASES. A PROTOTYPE SEISMIC SCRAM-MONITORING SYSTEM WILL BE DESIGNED AND IMPLEMENTED ON A SUN 3/160 ENGINEERING WORKSTATION. IN THE PROPOSED SYSTEM, SEISM ...

    SBIR Phase I 1987 Department of Energy
  8. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  9. A 34 GHz High-Power Micro-Pulse Klystron

    SBC: Fm Technologies Inc            Topic: N/A

    161 A 34 GHzHigh-Power Micro-Pulse Klystron--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. Frederick M. Mako, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82374 Amount: $75,000 High-current pulses of electrons are widely used in injector systems for electron accelerators, such as industrial linacs, as well ...

    SBIR Phase I 1997 Department of Energy
  10. A High-Charge Electron Gun for Dielectric Type Wake-Field Accelerators

    SBC: Fm Technologies Inc            Topic: N/A

    149 A High-Charge Electron Gun for Dielectric Type Wake-Field Accelerators--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. Frederick M. Mako, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82375 Amount: $75,000 The development of high-current, short-duration pulses of electrons used in injectors of particle a ...

    SBIR Phase I 1997 Department of Energy
US Flag An Official Website of the United States Government