You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations
SBC: American Research Corporation of Virginia Topic: N/A40417 November 18, 1996 American Research Corporation of Virginia This project addresses the hazardous waste problem at Department of Energy sites by developing a new class of ultrafiltration membranes for use in corrosive aqueous or organic streams. These membranes will utilize mesoporous ceramics, which have narrow pore size distributions and tailorabl ...
SBIR Phase II 1997 Department of Energy -
Bending System for Recirculating Accelerators with Space-Charged Dominated Beams
SBC: Fm Technologies Inc Topic: N/A41292 November 19, 1996 FM Technologies, Inc. A radically new type of particle accelerator, a multiturn recirculating linac operating with space-charge dominated beam currents, has received considerable attention during the last few years. Even with severe limits on the number of turns, the concept potentially offers major cost reductions for a very high ...
SBIR Phase II 1997 Department of Energy -
Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator
SBC: Fm Technologies Inc Topic: N/A41299 November 19, 1996 FM Technologies, Inc. In the Relativistic Klystron Two-Beam Accelerator, which is currently under development, power from a low-energy, high-current, bunched beam is converted to micro-waves via the klystron mechanism and used to provide power for a high-energy linac, specifically a future Next Linear Collider upgrade to l.0 TeV. ...
SBIR Phase II 1997 Department of Energy -
A Micro-Pulse Electron Injector
SBC: Fm Technologies Inc Topic: N/A41307 November 20, 1996 FM Technologies, Inc. High current electron pulses of short duration could be widely used in injector systems for electron accelerators, which have application in industry, medicine, and research. This project will develop a micro pulse electron injector system which is less complex, cumbersome, and expensive than existing systems ...
SBIR Phase II 1997 Department of Energy -
Large Room Temperature Cd1-xZnxTe Detectors
SBC: World Physics Technologies, Inc. Topic: N/A40169 W. Peter Trower Applications such as medical tomography, x-ray defectometry, and metallurgical processing require high resolution spectrometric detectors. At present, the desired resolution can only be achieved using germanium crystals cooled to cryogenic temperatures, conditions which severely limit applicability. This project will develop x-ray and gamma-ray detectors that operate at r ...
SBIR Phase II 1997 Department of Energy -
Oxidation Induction Time Technology for Electric Cable Condition Monitoring and Life-Assessment
SBC: Pacific-sierra Research Corp. Topic: N/A40735 November 13, 1996 Pacific-Sierra Research Corporation Electrical cables used in nuclear power plants are subjected to radiation and thermal stresses which degrade the condition of the insulation material. In-situ non-destructive testing methods are needed to perform cable condition monitoring and remaining life-assessment. Oxidation Induction Time ...
SBIR Phase II 1997 Department of Energy -
A HIGH-CURRENT, MICRO-PULSE ELECTRON SOURCE
SBC: Fm Technologies Inc Topic: N/AA MICRO-PULSE ELECTRON GUN THAT APPEARS CAPABLE OF PEAK CURRENTS OF ABOUT 10 KA WITH A MICRO-PULSE LENGTH OF SEVERAL PICOSECONDS (PS) OCCURING AT FREQUENCIES OF UP TO 10 GHZ IS BEING PLANNED. THE MICRO-PULSES OR BUNCHES ARE PRODUCED BY RESONANTLY AMPLIFYING A CURRENT OF SECONDARY ELECTRONS IN A RADIO FREQUENCY (RF) CAVITY. BUNCHING OCCURS RAPIDLY AND IS FOLLOWED BY SATURATION OF THE CURRENT DENSIT ...
SBIR Phase II 1993 Department of Energy -
AN ION PROBE FOR TIGHTLY-FOCUSED CHARGED PARTICLE BEAMS
SBC: MISSION RESEARCH CORP. Topic: N/ATHIS PROJECT PLANS TO DEVELOP A NOVEL, NONPERTURBING DIAGNOSTIC TO MEASURE THE POSITION, RADIUS, LENGTH, AND/OR CHARGE DISTRIBUTION OF TIGHTLY-FOCUSED, CHARGED PARTICLE BEAMS. THIS DIAGNOSTIC EMPLOYS A LOW ENERGY ( 50 KEV), LOW CURRENT ( 1MUA) STREAM OF IONS TO PROBE THE CHARGED PARTICLE BEAM. THE PROBE IONS ARE INJECTED ACROSS THE PATH OF THE RELATIVISTIC BEAM AND ARE DEFLECTED BY THE ELECTROMAGN ...
SBIR Phase II 1993 Department of Energy -
DEVELOPMENT OF A CONTAMINATION MONITOR USING VISUAL IDENTIFICATION
SBC: Shonka Research Associates Topic: N/ATHIS PROJECT WILL RESEARCH AND DEVELOP A FLOOR MONITOR FOR QUICK DETERMINATION OF RADIOACTIVE CONTAMINATION. THE MONITOR WILL UTILIZE A NEW PORTABLE TECHNOLOGY (INCLUDING SUPPORT ELECTRONICS). IT WILL HAVE THE CAPABILITY TO MEASURE BETA CONTAMINATION BELOW 5000 DPM/100 CM SQUARED WHEN AVERAGED OVER ONE SQUARE METER AND COVER AN AREA AS LARGE AS SEVERAL SQUARE FEET PER SECOND. IT WILL ALSO BE CAPAB ...
SBIR Phase II 1993 Nuclear Regulatory Commission -
DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION
SBC: Shonka Research Associates Topic: N/ATWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.
SBIR Phase II 1990 Nuclear Regulatory Commission