You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Ionic Self-Assembled Organic/ Inorganic Nonparticle Coatings and Composites

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  2. THE RESEARCH INVESTIGATOR'S TECHNOLOGY SYSTEM "RITA"

    SBC: Intellicorp            Topic: N/A

    COORDINATING INFORMATION EXCHANGE BETWEEN A LARGE NUMBER OF INTERRELATED RESEARCH AND DEVELOPMENT (R&D) PROJECTS HAS TYPICALLY BEEN CONDUCTED USING HIERARCHICAL DATA BASE MANAGEMENT SOFTWARE FOR CATALOGING AND RETRIEVING PROJECT RECORDS. AN INTELLIGENT R&D INVESTIGATOR'S ASSISTANT, ONE THAT USED OBJECT-ORIENTED PROGRAMMING TECHNIQUES TO CLASSIFYPROJECTS AND THAT COULD EMPLOY SUBJECTIVE KNOWLEDGE A ...

    SBIR Phase I 1990 Department of Transportation
  3. Unobtrusive Eyelid Closure & Visual Point of Regard Measurement Device

    SBC: EYEGAZE INC            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. LASER RADAR MEASUREMENT SYSTEM FOR ROADSIDE ENCROACHMENT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  6. ADVANCED VACUUM INSULATION FOR REFRIGERATED SHIPPING CONTAINERS

    SBC: Re/Spec Inc.            Topic: N/A

    A RESEARCH PROGRAM IS PROPOSED TO DETERMINE THE FEASIBILITY OF USING ADVANCED VACUUM INSULATIONS TO IMPROVE THE PRODUCTIVITY OF REFRIGERATED SHIPPING CONTAINERS WHILE AVOIDING THE ENVIRONMENTAL RISKS ASSOCIATED WITH CHLOROFLUOROCARBONS (CFC'S) IN FOAM INSULATION CURRENTLY BEING USED. ADVANCED VACUUM INSULATIONS, CURRENTLY UNDER RESEARCH AND DEVELOPMENT, DO NOT CONTAIN CFC'S AND HAVE VERYHIGH THERM ...

    SBIR Phase I 1990 Department of Transportation
  7. High Resolution Data Sources and Applications for Transportation Planning

    SBC: Shenandoah Mountain            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  8. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires

    SBC: UTD, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
US Flag An Official Website of the United States Government