You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High Permeance Hybrid Membranes for CO2 Separation

    SBC: ASPEN PRODUCTS GROUP INC            Topic: 09a

    The capability to efficiently remove carbon dioxide from industrial gas streams is desirable for a wide variety of applications. Carbon dioxide (CO2) is a byproduct of many industrial processes associated with the transformation of fossil fuels into usable products such as heat, electricity, and chemicals. In addition to being a greenhouse gas pollutant, the presence of carbon dioxide in chemical ...

    SBIR Phase I 2011 Department of Energy
  2. Switched-Field Surface NMR for Enhanced Detection andResolution of Shallow Groundwater

    SBC: VISTA CLARA INC.            Topic: 24c

    This proposal addresses the challenge of mapping groundwater and hydrogeologic parameters in the subsurface, with a focus on improving sensitivity and spatial resolution for shallow groundwater targets. We will apply imaging methodologies at the core of medical MRI to efficiently map shallow groundwater and hydrogeologic properties at improved resolution. Conventional surface NMR has been proven a ...

    SBIR Phase I 2019 Department of Energy
  3. Isogeometric Analysis for Nuclear Engineering

    SBC: Coreform LLC            Topic: 03b

    Finite element analysis (FEA) is severely underutilized in the mining industry. The complexity of the physics and the geometry of mining problems is not suitably handled by the faceted mesh descriptions commonly used in other industries, such as automotive and aerospace. Furthermore, the time required to convert computer-aided design (CAD) files and geologic survey data to FEA is prohibitively lon ...

    SBIR Phase I 2019 Department of Energy
  4. Novel Probe of Oxygen and its Isotopes for Millimeter-Scale Measurements of Soil Dynamics

    SBC: AERODYNE RESEARCH INC            Topic: 24a

    One of the major challenges facing the world is the creation of sustainable energy sources. Biofuels and bioproducts have great potential. But the development of sustainable and efficient agricultural production methods requires deep understanding of the dynamics of plant-microbe-mineral interactions within the rhizosphere. Technologies that probe soil microbial activity in real time with high spa ...

    SBIR Phase I 2019 Department of Energy
  5. Providing Actionable Intelligence from Multi-Modal, Multi-Scale Data in Agriculture

    SBC: Arva Intelligence Corp            Topic: 01a

    As an industry, agriculture is rapidly adopting modern data collection and analysis procedures to help guide farming practices. Despite the increasing amounts of data in agriculture and almost universal adoption rates of major seed, synthetic fertilizer, and chemical innovations, worldwide crop yield growth rates have plateaued to less than 1% annually. This increased data on multiple aspects of c ...

    SBIR Phase I 2019 Department of Energy
  6. MODE: The Multi-omics Data Exploration Platform

    SBC: HAFEN CONSULTING LLC            Topic: 01c

    In the biological and environmental sciences, data are being generated at an unprecedented rate. There are many scientific discoveries pertinent to DOE missions that are waiting to happen from high-throughput biological data, if only it could be efficiently and effectively managed and explored. The size and complexity of the data are the main factors that pose challenges to effective exploration, ...

    STTR Phase I 2019 Department of Energy
  7. Plasma Catalyst Coupling for Improved Conversion of Carbon Dioxide to Methanol

    SBC: HIFUNDA LLC            Topic: 20d

    The current cost of implementation of carbon capture and storage (CCS) is well above practical levels, more than tripling the cost of power generation, without carbon credit offsets. Therefore, for US coal plants to be able to implement CCS without significant negative economic impact, there is a critical need for new CCS technologies that can change this economic picture dramatically. One way to ...

    SBIR Phase I 2019 Department of Energy
  8. Additives for Improved Cell Reliability

    SBC: XILECTRIC INC            Topic: 13a

    This Small Business Innovation Research project will develop new additive strategies to improve the cost and cell reliability of Li-ion batteries for electric vehicle applications. Xilectric’s technology seeks to dramatically improve Li-ion abuse tolerance to high temperatures and voltages by better maintaining the Li-ion electrolyte. Our additives improve the capacity retention and rate capabil ...

    SBIR Phase I 2019 Department of Energy
  9. Advanced Power Conversion Systems featuring SiC MOSFETs with In-Situ Restoration Capabilities

    SBC: GENESIC SEMICONDUCTOR INC.            Topic: 06b

    Power electronics for Grid-tied Battery Energy Storage Systems (BESS) featuring: (a) newly developed monolithically integrated High Voltage SiC MOSFET- Schottky Diodes; (b) Intelligent Gate Drivers that provide in-situ monitoring and restoration capabilities; and (c) novel three level Neutral point clamping topology are proposed. An isolated topology such as dual active bridge followed by an activ ...

    SBIR Phase I 2019 Department of Energy
  10. Automotive-qualified 3300 V SiC MOSFETs for next-generation extreme fast chargers

    SBC: GENESIC SEMICONDUCTOR INC.            Topic: 13b

    Next-generation extreme fast charging stations with 400 kilowatt output is identified as key to significantly increase the market share of electric vehicles. As compared to the existing 50 kW fast charging stations, future 400 kW rated extreme charging stations directly connected to the medium-voltage electricity grid will require the development of 3300 volt rated, automotive-qualified silicon ca ...

    SBIR Phase I 2019 Department of Energy
US Flag An Official Website of the United States Government