You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Fast Infrared Linear Miniature Spectrometer

    SBC: En'urga Inc.            Topic: N/A

    N/A

    SBIR Phase I 1998 National Aeronautics and Space Administration
  2. Integration of Materials and Technologies into an Innovative, Low-Cost, Composite, Spray-Up Toolings System (STS)

    SBC: Global Aircraft Corp.            Topic: N/A

    N/A

    SBIR Phase I 1998 National Aeronautics and Space Administration
  3. An Eddy-Current Inversion Algorithm for Aerospace Structures and Materials

    SBC: Sabbagh Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1998 National Aeronautics and Space Administration
  4. Modular System of Microscopic Observation Chambers for the Study of Fluids and Living Systems

    SBC: TECHSHOT, INC.            Topic: N/A

    N/A

    SBIR Phase I 1998 National Aeronautics and Space Administration
  5. Integrated Dynamic Cell Culturing System for the Bioprocessing Facility

    SBC: TECHSHOT, INC.            Topic: N/A

    N/A

    SBIR Phase I 1998 National Aeronautics and Space Administration
  6. MCSM: A control strategy for holonomic/nonholonomic robot systems

    SBC: Yoder Software, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1998 National Aeronautics and Space Administration
  7. Planar Chemiluminescence Absorption Tomography

    SBC: En'urga Inc.            Topic: T2

    nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp; Enrsquo;Urga Inc. will evaluate the feasibility of utilizing Planar Chemiluminescence Absorption Tomography (PCAT) to characterize the combustion process at the exit plane of rotating detonation enginesnbsp;(RDEs).nbsp; The two key issues that will be addressed during the Phase I work are: (1) the feasibility of non-intrusive determination of ...

    STTR Phase I 2019 National Aeronautics and Space Administration
  8. Neuroevolution of Electronic Liquid State Machines

    SBC: Warrant Technologies LLC            Topic: H6

    The subtopic being addressed identifies current spacefaring computer hardware as insufficient for executing conventional artificial intelligence (AI) algorithms due to space, weight, and power constraints. Conversely, neuromorphic computing architectures have exhibited the ability to performatively execute AI programs while meeting these criteria. Presented here is one such general purpose neuromo ...

    SBIR Phase I 2019 National Aeronautics and Space Administration
  9. Aerodynamically Stable DragSails for Spacecraft Deorbit

    SBC: VESTIGO AEROSPACE, INC.            Topic: Z8

    The safe disposal of spacecraft upon mission completion is necessary to preserve the utility of high-value orbits. It is forecasted that up to 2,600 nanosatellites and microsatellites will be launched into orbit over the next five years, and plans for large commercial constellations consisting of thousands of small satellites in low Earth orbit are currently in development. nbsp;NASArsquo;s Small ...

    SBIR Phase I 2019 National Aeronautics and Space Administration
  10. A Modular Sensor Suite for Propulsion Testing

    SBC: En'urga Inc.            Topic: H10

    nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp;nbsp; Enrsquo;Urga Inc. will evaluate the feasibility of utilizing a modular sensor suite as general purpose combustion diagnostic for rocket propulsion systems. nbsp;The two key issues that will be addressed during the Phase I research work are: (1) the feasibility of configuring a modular tomographic sensor suite that can be used measure path int ...

    SBIR Phase I 2019 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government