You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Workflow Management and Prioritization for Allocator and Assessor Processing

    SBC: DEUMBRA, INC.            Topic: N/A

    The current problem of handling thousands of workflows and hundreds of tasks associated with these workflows within the current ALP architecture is enormous. In this effort we propose efficient and scalable data structure and algorithms that can order the workflows and associated tasks to be processed by the Assessor. In addition, we provide the capability to correlate workflows with actual logi ...

    SBIR Phase I 1998 Department of DefenseDefense Advanced Research Projects Agency
  2. Agent Based Dynamic View Management System for Distributed Integrated Shipboard Databases on the Internet

    SBC: DEUMBRA, INC.            Topic: N/A

    We shall develop a dynamic agent web architecture and software prototype that builds on top of COTS database integration technology to deliver view management and data mining services.The data mining services shall consist of case based reasoning and association. We shall use case based reasoning and association agents in identifying new links and relationships within data contain in shipboar ...

    SBIR Phase I 1998 Department of DefenseNavy
  3. Dynamic Data Mining for Information Exploitation

    SBC: DEUMBRA, INC.            Topic: N/A

    Sucessful completion of Phase I efforts shall provide the Air Force with an intelligent dynamic data mining architecture and demonstration prototype. We shall develop the concept of a profile that shall be used as a basis for identification and linking of relationships based on a rough sketch or profile of the situation. The use of profiles shall be used in enhancing existing case-based and asso ...

    SBIR Phase I 1998 Department of DefenseAir Force
  4. GENERAL SOFTWARE TOOLS FOR BIOMEDICAL RESEARCH

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Health and Human Services
  5. Real-Time Equipment Analyst & Monitor

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1998 National Aeronautics and Space Administration
  6. Feasibility of a Universal Design Bathroom Sink & Vanity

    SBC: Accessible Designs/Adjustable            Topic: N/A

    People with disabilities, the elderly, and those who are non-disabled desire the development of bathroom vanity and sink designs that incorporate universal design. Developers of federally subsidized housing (HUD) and assisted living facilities have similar design needs for affordably meeting the needs of residents and accessibility laws. Phase I research found that conventional bathroom sink and v ...

    SBIR Phase I 1998 Department of Agriculture
  7. Web-Based School Newspaper as a Learning Tool for Young At-Risk Students

    SBC: Acme Express, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Education
  8. Greenhouse Gases Sustain Landfill EcoComplex: Utilization of Landfill CO2 for Commercial Crops and Landfill Methane for Fuel Cells

    SBC: Acrion Technologies, Inc.            Topic: N/A

    50690-98-I Greenhouse Gases Sustain Landfill EcoComplex: Utilization of Landfill CO2 for Commercial Crops and Landfill Methane for Fuel Cells--Acrion Technologies, Inc., 9099 Bank Street, Cleveland, OH 44125-3436; (216) 573-1187 Dr. William R. Brown, Principal Investigator Dr. William R. Brown, Business Official DOE Grant No. DE-FG02-98ER82516 Amount: $74,548 Landfill gas (contaminated methan ...

    SBIR Phase I 1998 Department of Energy
  9. Modifications to ANR Communication Headsets for Improved Attenuation and Speech Intelligibility

    SBC: Adaptive Technologies, Inc.            Topic: N/A

    ANR technologies have been successfully incorporated in communication headsets to improve speech intelligibility and hearing conservation in high noise environments. This Phase I research effort will introduce advancements in optimal controller/headset architectures that will lead to: greater SPL attenuations at the ear, significantly extended ANR bandwidth, and improvements in speech intelligibi ...

    SBIR Phase I 1998 Department of DefenseArmy
  10. CDL OPNET ANALYSIS SYSTEM

    SBC: Adroit Systems, Inc.            Topic: N/A

    The CDL Standard and associated channelization structure was established over 20 years ago and are not optimized for current networking technologies. As networking technologies are integrated into CDL and new sensors are deployed, the demand for CDL bandwidth is increasing. Specifically, the insertion of ATM into the CDL architecture has raised some issues concerning data integrity due to the hi ...

    SBIR Phase I 1998 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government