List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. VISUALIZATION OF BUILDING INFORMATION

    SBC: Interface Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Commerce
  2. EVALUATION OF GENERAL FAILURE TYPES IN SAFETY ANALYSIS

    SBC: John Wreathall & Company            Topic: N/A

    THIS WORK IS TO DEVELOP A METHOD TO IMPROVE THE ABILITY OF THE USNRC TO EVALUATE THE OPERATIONAL SAFETY SIGNIFICANCE OF OCCURANCES AT NUCLEAR POWER PLANTS. PERHAPS THE AREA OF GREATEST SAFETY SIGNIFICANCE IS HUMAN PERFORMANCE, BUT THE TECHNIQUES USED BY NRC DO NOT EVALUATE HUMAN PERFORMANCE IN ANY SYSTEMIC WAY. THE WORK IS PROPOSED TO BE PERFORMED IN THREE STAGES, AND BUILDS ON METHODS THAT HAVE B ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  3. Development of Intensity Controls for Fiber Optic Approach Light Systems

    SBC: Lighting Innovations, LLC            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Transportation
  4. New High Efficiency Light Sources for Airfield Lighting Systems

    SBC: Lighting Innovations, LLC            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Transportation
  5. Low Cost High Resolution Infrared Laser Range Finder for Pavements

    SBC: SPECTRA RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Transportation
  6. Feasibility of a Universal Design Bathroom Sink & Vanity

    SBC: Accessible Designs/Adjustable            Topic: N/A

    People with disabilities, the elderly, and those who are non-disabled desire the development of bathroom vanity and sink designs that incorporate universal design. Developers of federally subsidized housing (HUD) and assisted living facilities have similar design needs for affordably meeting the needs of residents and accessibility laws. Phase I research found that conventional bathroom sink and v ...

    SBIR Phase I 1998 Department of Agriculture
  7. INTEGRATED FOREST RESOURCE PLANNING UNDER CONSTRAINTS

    SBC: Forest Biometrics            Topic: N/A

    The objective for this Phase II are to: 1) Develop a common approach to build forest management plans for long-term planning that integrate vegetation, wildfire, hydrology, topography and environmental parameters. 2) Document this approach through hands-on sample databases that include appropriate overlays of vegetation, roads, streams, topography and land use. 3) Create a user environment that ...

    SBIR Phase I 1998 Department of Agriculture
  8. A Simplified Commercial Synthesis for Boll Weevil Pheromone, Grandlure I

    SBC: IPM Development Company Inc.            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Agriculture
  9. Development of a Semiochemical-Based Trapping System for the Varroa Mite

    SBC: IPM Development Company Inc.            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Agriculture
  10. COUNTING TROUT AND SALMON FRY

    SBC: Jensorter Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Agriculture

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government