You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Multi-Agent Based Small Unit Effects Planning and Collaborative Engagement with Unmanned Systems

    SBC: KUTTA TECHNOLOGIES, INC.            Topic: A07032

    For Phase II, Kutta proposes their Autonomous Multi-Mission Planner and Controller Tool (AMMPACT) solution to produce a lightweight, modular, ruggedized heterogeneous unmanned vehicle controller. The AMMPACT product goal is to assist the Army with increasing the lethality and survivability of the warfighters while reducing the amount of equipment required to be carried. Kutta’s AMMPACT product ...

    SBIR Phase II 2008 Department of DefenseArmy
  2. ULTRA-LINEAR ELECTRO-OPTIC DIRECTIONAL COUPLER BASED ON HYBRID SOL-GEL/EO POLYIMIDE WAVEGUIDES

    SBC: TIPD LLC            Topic: SB062016

    The phase 2 program will be focused on (1) Optimization of the design of the ultra-linear directional coupler, (2) fabrication of hybrid ultralinear directional coupler modulator chip, (3) demonstration of the increase of the elctro-optic coefficient to more than 300 pm/V and reduction of the drive voltage to less than 1 V, (3) achieve an effective optical loss of less than 1.5 dB/cm in the acti ...

    SBIR Phase II 2007 Department of DefenseDefense Advanced Research Projects Agency
  3. Prognostic for Process-Related Integrated Circuits (IC)

    SBC: RIDGETOP GROUP INC            Topic: N06006

    This SBIR is to design, develop, fabricate and package a suite of Integrated Circuit (IC) sensors as an IC chip. The chip, referred to as IC Prognostics chip, will contain four groups of sensors to sense damage to the “canary” devices on the IC chip: a damaged canary indicates a high probability of similar damage to like devices on an electronic assembly. There are three variations of IC Pr ...

    SBIR Phase II 2007 Department of DefenseNavy
  4. Prognostics and Health Management (PHM) for Digital Electronics Using Existing Parameters and Measurands

    SBC: RIDGETOP GROUP INC            Topic: N05093

    With its SBIR Partners Boeing, University of Tennessee and HRL Laboratories, Ridgetop develops novel techniques to determine system State-of-Health, and predicting failures in Digital Processors before they occur, and develop improved Remaining Useful Life (RUL) predictions. This will employ the use of existing measurands and operands. Current Area Prognostic Health Management (PHM) Managers and A ...

    SBIR Phase II 2007 Department of DefenseNavy
  5. Precision Guided Aerial Delivery of Intelligent Ground Based Munitions and Sensors

    SBC: STARA Technologies, Inc.            Topic: A07046

    The ability to accurately and covertly deliver light weight payloads from small aircraft redefines the way the US DOD performs air drop operations. The ability to emplace intelligent smart munitions, leaflets or light weight resupply bundles has bever been done before. Through this SBIR STARA will enhance its proven Mosquito 2 guided parachute system to create a dynamic, scalable guided parachut ...

    SBIR Phase II 2008 Department of DefenseArmy
  6. Ruggedized, Reconfigurable, Shock-Vibration Hardened Watercraft Stowage System

    SBC: SAFE INC            Topic: N05153

    The backbone of the 21st century fleet will be the next-generation of surface combatants such as the Littoral Combat Ship (LCS). The LCS will primarily operate in the littoral combat space acting as a central point of deployment, capture and re-deployment of naval surface craft and submersibles. The littoral combat space is also one of the key strategic locations enemies will deploy explosive de ...

    SBIR Phase II 2008 Department of DefenseNavy
  7. Joint Tactical Radio System (JTRS) Wideband Network Waveform (WNW) Host Simulator

    SBC: DataSoft Corp.            Topic: AF05312

    A WNW Host Simulator (WHS) can be considered an indoor open-air range in which a JTRS radio is given the various electronic stimuli it needs to “think” it is flight operation over a geographic area. The JTR Set and its waveforms are then “operated” in simulated conditions and its performance and integration with the host platform measured. The goal is to reduce the risk to flight testing b ...

    SBIR Phase II 2007 Department of DefenseAir Force
  8. Field-deployable source of Carbon Dioxide for use in Vector Surveillance

    SBC: CUBE Technology            Topic: A07152

    CUBE Technology has created an extremely compact and efficient enclosed combustor dubbed a Micro-Furnace that have demonstrated an unprecedented operating range. They operate on fuels from hydrogen to alcohol to JP-8. This Micro-Furnace combustor is fast-starting and burns less than 200gm of JP-8 fuel to deliver 400cc/minute of CO2 Mosquito attractant over 12 hours. In addition, this system inc ...

    SBIR Phase II 2008 Department of DefenseArmy
  9. Net-Centric Prognostics Health Management

    SBC: RIDGETOP GROUP INC            Topic: N07108

    Building on the successful research performed in Phase I of this SBIR, Ridgetop will develop cost-saving technologies to assess and improve the state-of-health of IT network components and services. The approach taken involves a four-step process: (1) regularly query network hardware and software via existing measurement points, (2) process the extracted data with advanced diagnostic and prognost ...

    SBIR Phase II 2008 Department of DefenseNavy
  10. Investigation of Combustion Instability in Augmentors Using High-Speed PIV and PLIF

    SBC: SPECTRAL ENERGIES LLC            Topic: AF071173

    The objective of this Phase-II effort is to build and deliver a high-speed laser system for performing particle-image velocimetry (PIV) and planar laser-induced fluorescence (PLIF) of OH at rates of 5 to 10 kHz in augmentor test facilities. This state-of-the-art laser system will allow velocity and 2-D flame radical measurements for understanding the complex spatio-temporal development of instab ...

    SBIR Phase II 2008 Department of DefenseAir Force
US Flag An Official Website of the United States Government