You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
An Advanced Vibrothermography Approach for Wind Turbine Applications
SBC: RESODYN CORPORATION Topic: 20bThe reliability of a wind turbine system is greatly impacted by hidden defects. An improved method of inspection is sought for manufactured composite materials. Also, field inspection methods to assure quality during and after installation are required. The ultimate goal of this project is to provide a reliable, portable, instrumentation deployment system that can be utilized during wind turbin ...
SBIR Phase II 2010 Department of Energy -
Recovery Act- Springboard Engineering's Smart Grid Controller for Non-Smart Household Electricity-Consuming Appliances
SBC: Springboard Engineering, Inc. Topic: 07aThe Smart Grid opens the door to the development of many companion devices which will in turn enable the development of a variety of devices for household electricity-consuming appliances that can communicate with it; especially, many major appliance manufacturers (such as Whirlpool and General Electric) have made public commitments to design their appliances to be Smart Grid-compatible over the n ...
SBIR Phase I 2010 Department of Energy -
Hyperspectral Sensor for Large-Area Monitoring of Carbon-Dioxide Reservoirs and Pipelines
SBC: RESONON, INC. Topic: 04bGeologic carbon sequestration has the potential to store a century¿s worth of anthropogenic carbon dioxide production. However, this solution will require numerous large underground reservoirs that may extend over hundreds of square kilometers and an extensive network of pipelines, some of which will be on the order of hundreds of kilometers long. Consequently, very large areas will need to b ...
STTR Phase I 2008 Department of Energy -
Enhancing Homologous Recombination in Plants Through the Use of Custom Endonucleases
SBC: Advanced Genome Technologies, Llc Topic: 48Homologous recombination (HR) permits the precise insertion, deletion, or substitution of genetic material in the genome of an organism. HR offers numerous opportunities for modifying plant genomes to enhance our understanding of plant gene function and regulation, especially with respect to enhancing the production of biofuels. Although HR normally occurs at very low frequencies, approximately ...
SBIR Phase I 2007 Department of Energy