You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ASSESSMENT OF FIBER REINFORCED PLASTICS FOR COMBATANT SUBMARINE STRUCTURES

    SBC: Abaris            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseNavy
  2. SENSITIVITY

    SBC: 3c Systems, Inc.            Topic: N/A

    THE OBJECTIVES OF PHASE 1 ARE TO ACQUIRE AND ASSEMBLE DATA ON MUNITION SENSITIVITY TO DYNAMIC INPUTS, DEVELOP DISCRETE ELEMENT CODES FOR LOADING AND REACTION OF EXPLOSIVES AND MUNITIONS, EVALUATE THE PREDICTIVE UTILITY OF THESE CODES TO PREDICT REACTION THRESHOLDS OF MUNITIONS, AND TO PLAN THE PHASE 2 PROGRAM OF TESTING AND COMPUTER MODEL IMPROVEMENT. THE GENERAL APPROACH IN PHASE 1 IS TO EVALUATE ...

    SBIR Phase I 1986 Department of DefenseNavy
  3. SYMPATHETIC DETONATION

    SBC: 3c Systems, Inc.            Topic: N/A

    THE OBJECTIVES OF PHASE 1 ARE TO ACQUIRE AND ASSEMBLE DATA ON MUNITION SENSITIVITY TO SYMPATHETIC DETONATION, DEVELOP DISCRETE ELEMENT CODES FOR LOADING AND REACTION OF EXPLOSIVES, EVALUATE THE PREDICTIVE UTILITY OF THESE CODES TO PREDICT SYMPATHETIC DETONATION OF MUNITIONS, AND TO PLAN THE PHASE 2 PROGRAM OF TESTING AND COMPUTER MODEL IMPROVEMENT. THE GENERAL APPROACH TO PHASE 1 IS TO EVALUATE TH ...

    SBIR Phase I 1986 Department of DefenseNavy
  4. DEVELOPMENT OF A HIGHLY RELIABLE COST-EFFECTIVE CONTINUOUS MCONTINUOUS EMISSION MONITOR

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    THE PURPOSE OF THE PROPOSED PROJECT IS TO PROVIDE A PROOF OFCONCEPT EVALUATION OF AN INSTRUMENT CAPABLE OF MEASURING NO,02, AND SO2 USING UV ABSORPTION AND A PHOTODIODE ARRAY SPECTROPHOTOMETER. IF SUCCESSFUL, THIS INSTRUMENT WOULD SATISFY ALL THE REQUIREMENTS OF A CONTINUOUS EMISSION MONITORING SYSTEM REQUIRED BY THE ENVIRONMENTAL PROTECTION AGENCY. SINCE ALL THREE GASES WOULD BE MEASURED WITH A S ...

    SBIR Phase II 1986 Environmental Protection Agency
  5. DISTRIBUTED DIGITAL CONTROLLER ARCHITECTURE FOR ADAPTIVE CONTROL

    SBC: Addmaster Corp.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseNavy
  6. IMPROVED MATERIALS FOR CERAMIC ARMOR FABRICATION

    SBC: ADVANCED REFRACTORY TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseNavy
  7. ADVANCED COMPOSITES LABORATORIES WILL DEVELOP AN IMPROVED MOUNTAINEERING SKI FOR MILITARY USE.

    SBC: Advanced Composites Labs            Topic: N/A

    ADVANCED COMPOSITES LABORATORIES WILL DEVELOP AN IMPROVED MOUNTAINEERING SKI FOR MILITARY USE. WE WILL INCORPORATE THE BEST OF DOWNHILL SKI TECHNOLOGY WITH THE BEST OF TELE MARK AND MOUNTAINEERING SKI TECHNOLOGY TO PRODUCE A SKI FOR THE US MARINE CORPS WHICH WILL MEET THE REQUIREMENTS OF THE MARINE CORPS TOICS N86-13. WE WILL USE ADVANCED COMPOSITE MATERIALS TO ALLOW US TO PROVIDE A HIGH PERFORMAN ...

    SBIR Phase I 1986 Department of DefenseNavy
  8. THE OBJECTIVE OF THE PROPOSED STUDY IS TO PROVIDE FOR THE VERY FAST EXECUTION OF THE MINIMUF 3.

    SBC: ADVANCED DIGITAL SYSTEMS, INC.            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED STUDY IS TO PROVIDE FOR THE VERY FAST EXECUTION OF THE MINIMUF 3.1 HF PROGATION ALGORITHM WITHIN A PERSONAL COMPUTER. THE EXECUTION TIME GOAL FOR A LATITUDE - LONGITUDE POINT PAIR COMPUTATION IS 1 MILLISECOND OR LESS. THE APPROACH IN THIS PROPOSAL TO ACHIEVE THIS EXECUTION TIME CONSISTS OF TWO ELEMENTS. TH E FIRST ELEMENT IS TO MINIMIZE THE NUMBER OF COMPUTATIONS NECE ...

    SBIR Phase I 1986 Department of DefenseNavy
  9. SPARE PART SERIAL TRACKING

    SBC: Advanced Marine Enterprises,            Topic: N/A

    IT IS PROPOSED THAT A PLAN TO EVALUATE, SELECT, AND TEST (FOR ECONOMIC FEASIBILITY) AN ELECTRONIC SERIAL TRACKING SYSTEM BE DEVELOPED. MORE SPECIFICALLY, A MARKET SURVEY WILL BE CONDUCTED TO DETERMINE THE AVAILABLE ELECTRONIC TRACKING SYSTEMS. NEXT, THE CHARACTERISTICS AND PERFORMANCE OF EACH TRACKING SYSTEM WILL BE DOCUMENTED. THE LIKELY OPERATING ENVIRONMENTS OF THE TRACKING SYSTEM WILL THEN BE ...

    SBIR Phase II 1986 Department of DefenseNavy
  10. BEHAVIOR OF METAL MATRIX COMPOSITES AT CRYOGENIC TEMPERATURES

    SBC: Advanced Materials Laboratory            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseNavy
US Flag An Official Website of the United States Government