You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Non-contact, low-cost, stage and velocity sensors for monitoring urban streamflow
SBC: SUBSURFACE INSIGHTS LLC Topic: C5516bHalf of the world’s population lives in urban watersheds. In order to predict how these watersheds will behave under current and future weather dynamics (e.g. if , how and where flooding would occur due to intense rainfall), we need dense measurements of river stage and river velocity. Current instruments are too expensive to deploy in the quantities needed to provide these dense measurements. A ...
SBIR Phase I 2023 Department of Energy -
E4S: Extreme-Scale Scientific Software Stack for Commercial Clouds
SBC: PARATOOLS, INC Topic: C5302bC53-02b-271168The software used in High Performance Computing (HPC) and ArtificialIntelligence/MachineLearning (AI/ML) workloads is increasingly complex to maintain, install, and optimize. More problematic is the poor performance portability of applications between platforms, forcing site-specific re-engineering of codes. Existing solutions to deployment of AI/ML work?ows on commercial cloud envir ...
SBIR Phase II 2023 Department of Energy -
Engineered Enzymes for Polyurethane Recycling
SBC: Birch Biosciences, LLC Topic: C5331aC53-31a-271169Significant technical innovations are needed to improve the economics of plastic recycling. Plastic recycling rates in the United States have been stagnant for more than a decade: less than 10% of plastics are currently recycled, and only 5.5% of polyurethane plastics are recycled. Plastics have become a major contributor to global warming, as emissions from global plastics productio ...
SBIR Phase II 2023 Department of Energy -
SBIR Phase I:Advanced multi-locus genome engineering to enable consolidated bioprocessing for the low-cost conversion of lignocellulose to hydrocarbon fuels and products
SBC: Mascoma Corporation Topic: BTThe broader impact of this Small Business Innovation Research (SBIR) Phase I project is to test an innovative new approach to generating industrially valuable microorganisms. If successful, the new approach will be demonstrated by improving the ability of an engineered bacterium to convert components of biomass into fuel. The benefit of that research will be to help develop a technology that can c ...
SBIR Phase I 2023 National Science Foundation -
SBIR Phase I:Comfortable, Easy-to-Insert Hearing Protection Earplug
SBC: Rapa Technologies LLC Topic: MDThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase I project is a novel hearing protection device which reduces the societal cost of noise induced hearing loss. Noise induced hearing loss is the one of the most prevalent occupational injuries in both US industry and the military, affecting more than 10 million workers at a total preventable economic cos ...
SBIR Phase I 2023 National Science Foundation -
SBIR Phase I:Radiation Tolerant, High-Voltage, Silicon Carbide Devices
SBC: SCDEVICE LLC Topic: SThe broader/commercial impact of this Small Business Innovation Research (SBIR) Phase I project is to enable smaller, lighter, and higher-performance satellites, thereby making satellites cheaper to manufacture and launch. Lighter satellites reduce launch costs or permit greater payload performance for a given mass. Less fuel is required to launch lighter satellites, reducing the environmental imp ...
SBIR Phase I 2023 National Science Foundation -
SBIR Phase I:Smart Control Automation and Learning for Energy
SBC: Tanya Barham Topic: ENThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase I project is to develop a commercial building management system that uses model predictive control for small to mid-sized commercial building owners to help them flexibly manage increasingly complex energy codes and prices. This technology uses machine learning to automate costly aspects of advanced bui ...
SBIR Phase I 2023 National Science Foundation -
STTR Phase I:Electronic Measurement of Capillary Refill Time to Improve Outcomes from Sepsis
SBC: Scott Filer Topic: MDThe broader impact/commercial potential of this Small Business Technology Transfer (STTR) Phase I project is a novel external system for rapidly diagnosing sepsis by measuring capillary refill time (CRT). Independent clinical studies have demonstrated the utility of CRT for detecting sepsis. Current methods for monitoring capillary refill times rely on physical examinations that are both prone to ...
STTR Phase I 2023 National Science Foundation -
SBIR Phase II:Full-Scale Demonstration of Autonomous Robotic Greenhouse for Sustainable Local Food Production
SBC: CANOPII INC. Topic: ETThe broader/commercial impact of this Small Business Innovation Research (SBIR) Phase II project promotes small and mid-sized farming in the United States through environmentally friendly means. Through cost-effective labor automation, a fully automated, turn-key greenhouse production system can be made more accessible. This project will provide farmers with a tool that can guarantee a baseline an ...
SBIR Phase II 2023 National Science Foundation -
SBIR Phase II:High Energy-Density Hydrogen-Halogen Flow Batteries for Energy Storage
SBC: SKIP TECHNOLOGY INC Topic: ENThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) project is directly related to the utilization of renewable energy sources in the electrical grid.Due to the variability of supply, renewable energy generators (e.g. solar and wind) cannot supply the entire electrical demand as these often under-produce during times of high demand and over-produce during time ...
SBIR Phase II 2023 National Science Foundation