You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. FolksART

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: SB082032

    Historically speaking, subjectivity was mostly considered as problematic and undesirable. Recently, the availability of the inherently subjective folksonomies has made it readily apparent that inherent subjectivity is highly desirable and that it can be accounted for and utilized by superimposing multiple structures onto data without requiring changes to the underlying data, thus addressing users ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  2. Small Engines Designed for High Efficiency, High Power Density and Quiet Operations

    SBC: XRD, INC.            Topic: SB082010

    XRD Inc. will deliver a feasibility study and work plan to produce engines operating on heavy fuel that meets the objectives of Program Solicitation entitled “Small Engines designed for High Efficiency, High Power Density and Quiet Operations”. The goal is to have power density greater than 1 hp per pound and greater than 25% thermal efficiency while operating on available heavy fuels. This n ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  3. 3DWAR: 3D Wide Area Reconstruction

    SBC: DEUMBRA, INC.            Topic: SB082028

    The 3D Wide Area Reconstruction (3DWAR) effort brings the operational benefits of superior 3D reconstructions to the warfighter. Superior performance is achieved by combining super-resolution (SR) and computational stereo processing to reconstruct 3D models of the combat environment with voxel size of one half the imagery ground sample distance. If input data has sufficient 3D visual effects to su ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  4. Carbon Nanotube Plasma Limiter

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: MDA06034

    The enabling solid state semiconductor technology in modern electronics and radar systems increases their vulnerability to the effects of high power, fast rise-time EMP, HPM, and UWB pulses. In recent years, significant advances in the technology used to produce these pulses have been made in the United States and abroad, increasing the need for effective protection against these threats. Howeve ...

    SBIR Phase II 2009 Department of DefenseDefense Advanced Research Projects Agency
  5. Leap-Ahead Control Theoretic Applications

    SBC: WISE ENTERPRISES            Topic: SB082062

    In many cases, humans still out-perform today's best control systems. We could presumably approach human performance in these cases by building systems that more closely mimic human information processing, but unfortunately, that is still poorly understood. “Intelligent systems” try hard to mimic such processing, but all are deficient in various ways. Moreover, many control system engineers ar ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  6. Next-Generation Behavior Composer for Military Simulation

    SBC: ADVANCED ANTI-TERROR TECHNOLOGIES CORP            Topic: ST071004

    The primary aims and opportunities of the NexGEN Interface are revolutionary improvements to the OneSAF Behavior Composer and associated processes, to enable military personnel to rapidly and easily build or edit useful OneSAF behaviors for their training and operational purposes. Our NexGEN Interface focuses on military users who range from personnel with basic tactical skills to world-class tac ...

    STTR Phase II 2009 Department of DefenseDefense Advanced Research Projects Agency
  7. Maximizing Sleep Quality and Efficiency using Neurotechnology

    SBC: ADVANCED BRAIN MONITORING, INC.            Topic: SB072006

    Military operations require sustained cognitive performance in challenging environments. Situational awareness, vigilance, memory, decision-making, and other neurocognitive processes are all impacted by poor sleep quality, sleep deprivation and accumulating sleep debt with potentially detrimental consequences. Although efficient amelioration of the effects of sleep deprivation or accumulated sleep ...

    SBIR Phase II 2009 Department of DefenseDefense Advanced Research Projects Agency
  8. Streamlined Neurotechnology for Operational Applications

    SBC: ADVANCED BRAIN MONITORING, INC.            Topic: SB082007

    Advanced Brain Monitoring (ABM) developed patented low cost, easy-to-use, portable systems to monitor and interpret physiological signals, including the brain''s electrical activity (EEG) and cardiac activity. These technologies can be applied in real-time or off-line and have proven useful in quantifying the changes in alertness, learning and memory associated with sleep deprivation in healthy s ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  9. Novel Neurotherapy for Post-Traumatic Stress Disorder

    SBC: ADVANCED BRAIN MONITORING, INC.            Topic: SB082007

    The recent military buildup in Iraq and Afghanistan with its associated stressors of warfare have resulted in a significant increase in new cases of posttraumatic stress disorder (PTSD). Sleep disturbances comprise prominent features of PTSD and have been suggested to have a pathogenic role in the disease. PTSD is characterized by disinhibition of rapid-eye-movement (REM) sleep including decreas ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  10. Photovoltaic Cells for Very High Altitude Very Long Endurance Solar Aircraft

    SBC: 4POWER LLC            Topic: SB072043

    This proposed Phase II program will deliver a lightweight triple-junction solar cell that eliminates the current-matching bottleneck of current state-of-the-art InGaP/GaAs/Ge cells on Ge. This will be achieved by constructing a triple junction structure on the lattice constant of SiGe, allowing the integration of semiconductors with bandgaps that are optimized for the best possible triple-junctio ...

    SBIR Phase II 2009 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government